McKenzie River RD Roadside Brushing
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
This is an Award Notice for the McKenzie River RD Roadside Brushing opportunity issued by the USDA Forest Service, Willamette National Forest. The original solicitation, 1240BE26Q0055, was a Firm-Fixed Price, Stand-Alone Service Contract set aside 100% for Total Small Business. This notice confirms an award has been made, but specific awardee and value details are not provided in the available information.
Scope of Work
The contract requires roadside brushing services for the McKenzie River Ranger District (MRRD) in Oregon to ensure safe and productive road conditions. Key tasks include the removal of vegetation, trees less than 6 inches in diameter, and limbs from roadway and roadside surfaces. Specific services are "842 Roadside Brushing, Maintenance Level 2 Roads" and "842 Roadside Brushing, Maintenance Level 3-5 Roads." Performance standards mandate that vegetation removal must not interfere with traffic, obscure signs, or impede water flow, while maintaining roadside safety for the public. Debris removal is also required.
Contract Details
- Type: Firm-Fixed Price (FFP), Stand-Alone, Service Contract
- Set-Aside: Total Small Business (100%)
- NAICS Code: 115310 (Other Support Activities for Forestry)
- Size Standard: $11.5 million
- Period of Performance: June 1, 2026, to December 1, 2026
- Place of Performance: McKenzie Bridge, OR 97413, United States
- Original Offer Due Date: May 7, 2026, 1700 PT
- Award Notice Published: May 21, 2026
Key Considerations from Solicitation Documents
- Wage Determinations: Bidders were required to adhere to minimum wage rates and fringe benefits for various occupations in Oregon, Lane County, as per the Service Contract Act.
- Fire Protection: Mandatory fire prevention and suppression measures, including a fire plan, specific equipment, and adherence to Industrial Fire Precaution Levels (IFPLs), were critical due to operations within the National Forest.
- Geographical Context: Vicinity maps were provided to help bidders understand the project's geographical scope and access routes within the Willamette National Forest.
Amendment
Amendment 0001, dated April 23, 2026, incorporated the mandatory clause FAR 52.222-90, "Addressing DEI Discrimination by Federal Contractors (Apr 2026)," without affecting price, period of performance, or scope.