McNary Potable Water Upgrades

SOL #: W912EF26RSS14Sources Sought

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
US ARMY ENGINEER DISTRICT WALLA WAL
WALLA WALLA, WA, 99362-1876, United States

Place of Performance

Place of performance not available

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Maintenance Of Dams (Z1KA)

Set Aside

No set aside specified

Timeline

1
Posted
Mar 9, 2026
2
Response Deadline
Mar 24, 2026, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The US Army Corps of Engineers (USACE), Walla Walla District, is conducting a Sources Sought to identify capable businesses for the McNary Potable Water Upgrades project. This construction effort involves upgrading the potable water distribution system at McNary Dam in Umatilla County, Oregon. The purpose is to determine if this requirement can be set aside for small businesses. The NAICS code is 237990 (Other Heavy and Civil Engineering Construction) with a small business size standard of $45,000,000. Responses are due by March 24, 2026.

Scope of Work

This project entails upgrading the existing McNary Dam Potable Water Distribution System by replacing current potable water piping. The existing system must remain operational until the upgraded system is tested and commissioned. Key tasks include:

  • Pipe trench excavations for new pipelines.
  • Installation of valves and valve groups within subsurface concrete manholes.
  • Demolition of some existing valve groups and piping.
  • Connecting the new pipeline to an existing common tie-in point.
  • Modifications to existing concrete vaults and provision of a new valve vault.
  • Installation of two parallel 8-inch pipelines (1,400 feet) and a third 8-inch redundant line (240 feet), totaling approximately 3,040 linear feet of new pipe.
  • Ancillary site work, including demolition of abandoned railroad ties, earthwork repairs, and replacement of an 852 square foot reinforced concrete slab. The total construction disturbance area is estimated at just over 1 acre, with a 0.5-acre contractor staging area.

Key Requirements & Personnel

The project requires a dedicated Site Safety and Health Officer (SSHO) with OSHA 30-hour training and a Contractor Quality Control Manager (CQC) who has completed the Corps of Engineers' Construction Quality Management for Contractors course. Both must be on-site when work is performed. The contractor must also develop and maintain a Network Analysis System (NAS) schedule and utilize the Corps of Engineers' electronic Quality Control System. All work is subject to the Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1).

Response Requirements & Timeline

This is a Sources Sought notice, not a solicitation. Interested companies must submit the following information to Preston Jones (Preston.E.Jones@usace.army.mil) by 3:00 PM on March 24, 2026:

  1. A Capability Statement detailing interest, ability to perform, special qualifications, and in-house personnel.
  2. A list of technical experience similar to the scope of work, including project descriptions, schedules, dollar values, and the firm's role (specifying if a subcontractor).
  3. A statement of the company's bonding capacity.
  4. A statement of the company's business size and type (e.g., HUBZone, SDVOSB, 8(a), WOSB).
  5. The percentage of work the company intends to perform, noting if subcontracting exceeds 20%.

Contract & Timeline

  • Type: Sources Sought (for market research)
  • NAICS: 237990 (Other Heavy and Civil Engineering Construction)
  • Small Business Size Standard: $45,000,000
  • Response Due: March 24, 2026, 3:00 PM
  • Published: March 09, 2026

People

Points of Contact

Jani C LongSECONDARY

Files

Files

No files attached to this opportunity

Versions

Version 1Viewing
Sources Sought
Posted: Mar 9, 2026
McNary Potable Water Upgrades | GovScope