MDC Dredges A/E IDC, Philadelphia District, USACE
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Army Corps of Engineers (USACE), Philadelphia District (NAP) has issued a Justification for Other than Full and Open Competition (JOFOC) to increase the capacity of the existing Architect-Engineering (A/E) Single Award Task Order Contract (SATOC) W912BU-22-D-0014. This action raises the contract value from $15M to $19M, adding $4M to ensure continued support for the Marine Design Center's (MDC) dredge vessel design projects.
Scope of Change
This modification primarily impacts the contract's financial capacity. The additional $4M is designated to cover three modifications to existing Task Orders (TOs) and six new TOs, along with a contingency for unforeseen needs. The A/E services provided under this SATOC include engineering support and design work for the MDC, specifically for various Dredge Vessel Design and Engineering projects. This includes support for the replacement of JADWIN and POTTER Dustpan Dredges, assistance for a replacement vessel for the CURRITUCK dredge, reliability upgrades for the YAQUINA dredge, and support for multiple "Mega Projects" valued at approximately $750M.
Contract & Timeline
- Type: Justification for Other than Full and Open Competition for an existing A/E Single Award Task Order Contract (SATOC)
- Contractor: Bruce S. Rosenblatt & Assoc (BSR)
- Original Contract Value: $15,000,000
- Increased Contract Value: $19,000,000 (+$4,000,000)
- Set-Aside: The original SATOCs awarded to BSR were under a Small Business Set Aside.
- Period of Performance: The ordering period for the SATOC expires on March 22, 2027; no extension is included in this modification.
- Published Date: April 2, 2026
Justification
The increase is justified to prevent substantial duplication of cost and unacceptable delays that would arise if a new competition were sought. This ensures continuous, uninterrupted support for critical dredge vessel design and engineering requirements, accommodating previously unforecasted projects and accelerated needs.
Additional Notes
A replacement Indefinite Delivery/Indefinite Quantity (IDIQ) contract is anticipated to be awarded by August 2026.
Contact Information
- Primary: Stephen Kolokithias (stephen.t.kolokithias@usace.army.mil, 215-656-6898)
- Secondary: Anastasia Moffatt (anastasia.e.moffatt@usace.army.mil, 215-656-8688)