MELSTONE DAM LIVESTOCK WATER SUPPLY
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Bureau of Land Management (BLM), under the Department of the Interior, is soliciting proposals for the Melstone Dam Livestock Water Supply project in Musselshell County, Montana. This is a Firm Fixed-Price (FFP), single-award contract for the installation of a livestock water system. This procurement is a Total Small Business Set-Aside. Award will be based on the most advantageous quote, with Prior Demonstrated Experience considered more important than cost or price.
Scope of Work
The project involves the installation of a new livestock water system at the Melstone Dam reservoir. Key components include:
- Mobilization/demobilization and preparatory work.
- Installation of an inlet structure, riser casing, pump, and an 800W solar array.
- Installation of a tank and outlet.
- Installation of 1.5-inch and 4-inch HDPE pipelines for water distribution.
- Reclamation of all disturbed areas. The contractor will be responsible for obtaining necessary permits (unless government-provided), providing a Site Access Plan, adhering to site access and utility protection requirements, and installing temporary fencing. Coordination with another contractor working in the area on a separate project is also required.
Contract Details
- Contract Type: Firm Fixed Priced (FFP), Single Award Contract.
- Type of Construction: Heavy, involving "Construction Of Other Non Building Facilities."
- Estimated Magnitude: Between $25,000 and $100,000.
- NAICS Code: 237110 (Water and Sewer Line and Related Structures Construction), with a Small Business Size Standard of $45 Million.
- Period of Performance: From award through January 1, 2027.
- Timeline: Work must commence within 10 calendar days after receiving the "construction" Notice to Proceed (NTP) and be completed within 60 calendar days after NTP.
- Set-Aside: Total Small Business Set-Aside.
Submission & Evaluation
- Quote Response Date: July 6, 2026, 23:00Z.
- Questions Due: July 6, 2026, 17:00 Mountain Time, submitted via email to Chad Clapp (cclapp@blm.gov).
- Submission Method: Quotes must be submitted via email to chad_clapp@ios.doi.gov.
- Evaluation Factors: Award will be made to the responsible firm whose quote is most advantageous, considering price and Prior Demonstrated Experience. Prior Demonstrated Experience is considered more important than cost or price.
- Required Documents: Bidders must complete and submit a Past Performance Questionnaire and the Schedule of Items, providing pricing for each lump-sum component.
Additional Notes
A site visit is strongly urged and is scheduled for June 26, 2026. Registration in the System for Award Management (SAM) is required for award eligibility. Payments will be processed electronically through the U.S. Department of the Treasury's Invoice Processing Platform (IPP). Prevailing wage rates, as detailed in General Decision Number MT20260077, apply to this project.