Mesa Falls Boardwalk/Bench Replacement - A Request for Quote will be sent directly to at least (3) suppliers. Location is at Caribou-Targhee National Forest in Fremont County ID. POP will tentatively begin 06/01/2026 for materials.

SOL #: 1240LT26Q0005Pre-Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA INTERMOUNTAIN 8
Ogden, UT, 844012310, United States

Place of Performance

ID

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Construction Of Recreation Facilities (Non Building) (Y1PA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 12, 2026
2
Response Deadline
Mar 2, 2026, 12:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service has issued a presolicitation for the Mesa Falls Boardwalk/Bench Replacement project at Caribou-Targhee National Forest, Fremont County, ID. This project involves the removal and replacement of boardwalk and bench lumber. A Request for Quote (RFQ) will be sent directly to at least three suppliers. Responses for this presolicitation are due March 2, 2026.

Scope of Work

This project entails the removal and disposal of old pressure-treated lumber from the Mesa Falls boardwalk. It requires replacing all lumber with comparable stringers, deck boards, and other lumber, along with new connecting hardware. Existing metal railings, posts, anchors, and supports will remain in place to be reused. Additionally, redwood bench lumber and connecting hardware for 10 benches along the boardwalk and asphalt pathways will be replaced.

Contract & Timeline

  • Type: Presolicitation (RFQ to follow)
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Period of Performance (POP): Tentatively begins 06/01/2026 for materials, with onsite work also tentatively starting 06/01/2026.
  • Contract Time: 165 days
  • Response Due: March 2, 2026
  • Published: January 12, 2026

Evaluation

This is a presolicitation notice. A Request for Quote (RFQ) will be issued directly to at least three qualified suppliers.

Additional Notes

For inquiries, contact Terri Tucker at terri.tucker@usda.gov.

People

Points of Contact

Terri TuckerPRIMARY

Files

Files

No files attached to this opportunity

Versions

Version 1Viewing
Pre-Solicitation
Posted: Jan 12, 2026
Mesa Falls Boardwalk/Bench Replacement - A Request for Quote will be sent directly to at least (3) suppliers. Location is at Caribou-Targhee National Forest in Fremont County ID. POP will tentatively begin 06/01/2026 for materials. | GovScope