Messing and Berthing Barges
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
The work to be performed pursuant to the maintenance of the APL-61 are as follows; Work Item Number 042-00-001 Accountability of Manhour and Material Reservation; accomplish, 256-11-001 Bilge Pumps; rebuild and install, 437-21-001 Gauge; inspect and calibrate, 512-11-001 Ventilation System; troubleshoot, 516-11-001 Freezer Box Evaporator, Condenser and Compressor units; install, 555-11-001 Gaylord Hood System; inspect and certify; 555-32-001 Firefighting System; inspect, test, and certify, 593-11-001 CHT Aeration Pressure Switch Cabling; install, 982-31-001 Barge Systems Check Off List; accomplish, 992-11-001 Towing Service; provide, 992-11-002 Temporary Service. Work must be accomplished during the maintenance availability so the barge can continually support the needs of the United States Navy.