Middle East District Town Hall with Industry - Alternate Design and Delivery Methodologies
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Army Corps of Engineers (USACE), Middle East District, is hosting a Town Hall with Industry on March 26, 2026, to discuss Alternate Design and Delivery Methodologies (ADDM). This event seeks innovative solutions from Architect/Engineering and Industrial Construction experts to transform project development and execution, aiming to reduce delivery schedules, improve cost-effectiveness, and enhance overall quality and life-cycle value beyond traditional Design-Bid-Build or Design-Build models. Industry partners are encouraged to register and submit a questionnaire with feedback by March 20, 2026.
Event Details
The Town Hall will take place on March 26, 2026, from 8:00 AM - 4:00 PM EDT, with attendee check-in starting at 6:30 AM. It will feature two discussion sessions. Attendees can participate in-person at The Doubletree Hotel by Hilton Front Royal Blue Ridge Shadows, 111 Hospitality Drive, Front Royal, VA 22630, or online via Microsoft Teams Webinar. Registration is required for all participants via the provided link in the original notice.
Purpose & Objectives
USACE Middle East District is challenging industry partners to propose holistic solutions that integrate novel design concepts, cutting-edge construction techniques, and progressive project delivery frameworks. The core problem statement is: "How can USACE and Industry collaboratively structure and execute projects to significantly reduce delivery schedules, improve cost-effectiveness, and enhance the overall quality and life-cycle value of our infrastructure, moving beyond the limitations of our current delivery models of Design-Bid-Build (D-B-B) or Design-Build (D-B)?" This initiative aims to educate USACE on emerging methodologies, identify implementation barriers in the U.S. CENTCOM Area of Responsibility (AOR), and define potential pilot project opportunities.
Industry Engagement
USACE is seeking industry input on successful delivery models, project-constructor integration, case studies, technology integration, challenges in Foreign Military Sales (FMS) contexts, regulatory conflicts, and ideal pilot project characteristics. Desired attributes for proposed solutions include early and integrated collaboration, shared risk and reward, accelerated delivery, enhanced value, flexibility, adaptability, and transparency. A questionnaire is provided to gather company capabilities, experience, and interest, including participation in an Architect-Engineer Subject Matter Expert Panel.
Action Items & Deadlines
- Register for the event: All participants must register using the Microsoft Teams Webinar link provided in the original notice, regardless of in-person or online attendance.
- Submit Questionnaire & Feedback: Complete the attached questionnaire (SWM Town Hall with Industry - ADDM Questionnaire_26 March 2026 v2.pdf) and submit it, along with any topic-related feedback or written products, to LTC Jerry Andes II (jerry.o.andes@usace.army.mil), SFC Igor Malyshev (igor.d.malyshev@usace.army.mil), and Jeanette Farrell (Jeanette.M.Farrell@usace.army.mil) by 4:00 PM EDT on March 20, 2026. Use the subject line: "Town Hall with Industry - March 2026-Topic Feedback."
Contact Information
Primary Contact: Jerry Andes (jerry.o.andes@usace.army.mil, 540-665-3777) Secondary Contact: Igor Malyshev (igor.d.malyshev@usace.army.mil, 540-676-6533)