Midwest City Water Tower
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Army Corps of Engineers – Tulsa District has issued a Pre-Solicitation Notice for the construction of the Midwest City Water Tower and associated infrastructure in Midwest City, Oklahoma. This is not a solicitation for proposals but an advance notice for an upcoming unrestricted, firm-fixed price (FFP) contract. The project will be procured using a Lowest Price Technically Acceptable (LPTA) approach, with no tradeoffs permitted. The estimated magnitude of construction is between $10,000,000 and $25,000,000. The anticipated solicitation issuance is June 23, 2026, with proposals due around July 23, 2026.
Scope of Work
The project is a design-bid-build effort to improve the water distribution system in Midwest City's high-pressure zone. Key components include:
- Construction of a new 500,000-gallon elevated storage tank (EST), including piping, electrical, controls, and site improvements.
- Construction of a new high service pump station (HSPS), with associated piping, electrical, controls, site improvements, shoring, and dewatering.
- Installation of approximately 650 linear feet of new 12-inch ductile iron pipe.
- Piping reconfiguration at the existing Titan Tower Tank site (100 linear feet of 18-inch and 80 linear feet of 16-inch ductile iron pipe).
- Reconfiguration of distribution system piping at the corner of 15th Street and Westminster Road.
- All necessary erosion and sediment control, construction stormwater permitting, and stormwater management.
- Coordination and closure of required isolation valves.
Contract & Timeline
- Type: Pre-Solicitation for a Design-Bid-Build, Firm-Fixed Price contract
- Set-Aside: Unrestricted
- NAICS: 237110 (Water and Sewer Line and Related Structures Construction) - Size Standard: $45M
- PSC: Y1NE (Construction Of Water Supply Facilities)
- Estimated Magnitude: $10,000,000 - $25,000,000
- Estimated Duration: 450 calendar days
- Anticipated Solicitation Issuance: On or about June 23, 2026
- Estimated Proposal Due: On or about July 23, 2026
- Published: June 9, 2026
Evaluation
Award will be based on the Lowest Price Technically Acceptable (LPTA) approach, in accordance with FAR 15, Negotiated Procurement. Tradeoffs will not be permitted.
Additional Notes
This is a pre-solicitation notice for planning purposes only and does not constitute a request for proposals. No reimbursement will be made for any costs incurred in response to this notice. Interested parties should monitor SAM.gov for the formal solicitation. Primary contact is Tyler Godwin at tyler.l.godwin@usace.army.mil or 918-669-7281.