Mike Monroney Aeronautical Center (MMAC) Industrial Waste Water Treatment Plant Upgrades (New Single Story PEMB/Demo Old Building)

SOL #: MrktSrvy-IWTPUpgrade-MMACSources Sought

Overview

Buyer

Transportation
Federal Aviation Administration
6973GH FRANCHISE ACQUISITION SVCS
OKLAHOMA CITY, OK, 73125, United States

Place of Performance

Oklahoma City, OK

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

No PSC code specified

Set Aside

No set aside specified

Timeline

1
Posted
Apr 15, 2026
2
Response Deadline
Jun 22, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Federal Aviation Administration (FAA) is conducting a Market Survey for Industrial Wastewater Treatment Plant (IWTP) Upgrades at the Mike Monroney Aeronautical Center (MMAC) in Oklahoma City, OK. This is not a solicitation but market research to identify qualified firms for a potential project estimated between $10,000,000 and $20,000,000. Responses are due by June 22, 2026, 3:00 p.m. CT.

Scope of Work

The project involves the demolition of the existing IWTP and associated equipment, followed by the construction of a new facility. Key components include:

  • A new single-story, Pre-Engineered Metal Building (PEMB) of approximately 4,900 Gross Square Feet, housing industrial waste treatment processing, office/work areas, an equalization tank, storm shelter restroom, and utility support spaces.
  • Decommissioning and demolition of the existing IWTP (eIWTP) once the new IWTP (nIWTP) is operational and flow is diverted.
  • Replacement of Lift Stations #1, #3, and #4 with new double-walled fiberglass wet wells for secondary containment.
  • Demolition and filling of Lift Stations #2 and #5.
  • Demolition of the existing concrete containment trench and installation of new 4-inch inner diameter by 6-inch outer diameter double-walled CPVC piping via direct bury.

Contract & Timeline

  • Type: Market Survey / Sources Sought
  • Estimated Value: $10,000,000 - $20,000,000
  • Set-Aside: None specified (Market Survey)
  • Response Due: June 22, 2026, 3:00 p.m. CT
  • Published: April 15, 2026
  • Place of Performance: Oklahoma City, OK

Response Requirements

Interested firms should submit:

  • A Capability Statement identifying services provided, size and type of previous government/private sector contracts, years in business, small business size status (including socio-economic status), and current SAM.gov registration status/UEI.
  • Brief information on past projects of similar magnitude and scope (Agency/Customer, Dollar Amount, Scope).

Additional Notes

This is solely for market research; the FAA is not seeking or accepting unsolicited proposals and will not pay for any information received. Any costs incurred in preparing a response are at the vendor's expense. Submissions should be emailed to andre.casiano@faa.gov.

People

Points of Contact

Andre CasianoPRIMARY

Files

Files

No files attached to this opportunity

Versions

Version 1Viewing
Sources Sought
Posted: Apr 15, 2026
Mike Monroney Aeronautical Center (MMAC) Industrial Waste Water Treatment Plant Upgrades (New Single Story PEMB/Demo Old Building) | GovScope