Military Working Dog Kennel Hunter Army Airfield, Savannah, Georgia
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The US Army Corps of Engineers (USACE), Savannah District, is soliciting proposals for the construction of a SOF Military Working Dog (MWD) Kennel at Hunter Army Airfield, Savannah, GA. This is a Firm Fixed Price Contract set aside for 8(a) businesses. The project involves constructing an approximately 11,000 SF facility and demolishing an old kennel. Proposals are due by May 14, 2026, at 3:00 PM EDT.
Scope of Work
The project entails building a new 11,000 SF MWD Kennel, including kennel administration offices, a veterinary exam and surgical suite, an isolation area, an operating room, a TA-50 locker area, latrines with showers, a tack room, and food preparation and storage areas. It will feature indoor and outdoor kennels, and building utility support areas. Built-in systems will include fire alarm/mass notification, fire suppression, HVAC, energy management control system, electrical systems, and communications networks. Supporting facilities cover site preparation, utilities, vehicle parking, access drives, curb and gutter, sidewalks, storm drainage, and landscaping. The scope also includes the demolition of an old kennel adjacent to the site.
Contract & Timeline
- Type: Firm Fixed Price Contract
- Set-Aside: 8(a) Set-Aside (FAR 19.8)
- Product Service Code: Y1AZ (Construction Of Other Administrative Facilities And Service Buildings)
- Response Due: May 14, 2026, 3:00 PM EDT
- Published Date: April 30, 2026 (latest amendment)
Key Amendments & Updates
- Amendment 0003 (April 30, 2026): Removes DFARS clauses 252.204-7008, 252.204-7012, 252.204-7019, 252.204-7020, 252.204-7021, and 252.204-7025 from the solicitation.
- Amendment 0002 (April 13, 2026): Incorporated new documents including a narrative, asbestos and lead surveys, Furniture, Fixtures, and Equipment (FF&E) details, Structural Interior Design (SID), and Veterinary Equipment information. No revised specifications or drawings were included.
- Clarification to Amendment 0001 (April 13, 2026): Bidders must complete both updated bid acceptance schedules (pages 4-9 of B_08_Solicitation Amendment 0001...) which now reflect unit price columns and grand total amounts. Additionally, bidders must sign and date the SF 30 form for Amendment 0001 (B.08-Solicitation Amendment 0001... SF 30), found in Volume II.
- Amendment 0001 (April 3, 2026): Initially corrected the bid acceptance schedule periods to include unit price and grand total sections.
Site Visit Information
A pre-proposal site visit was held on April 9, 2026. Minutes from this visit confirm attendees were advised to thoroughly review the entire solicitation, specifications, drawings, and supporting documents, and to continuously monitor for further amendments. Contractors toured the project site, including Building 1030, which is slated for demolition. All specific or technical questions must be submitted via ProjNet as a Bidder Inquiry. A sign-in sheet from the site visit is also available.
Submission Requirements
Offerors are reminded to acknowledge all amendments and ensure their proposals incorporate the latest changes, particularly regarding the bid acceptance schedules and the SF 30 form.
Contact Information
For inquiries, contact Sarai Hayward at sarai.hayward@usace.army.mil or 912-652-5348.