Amendment 0002 // Design-Bid-Build RFP for Construct Central Energy Plant, Fort Hood, TX
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
This notice is Amendment 0002 to a Design-Bid-Build Request for Proposal (RFP) for the construction of a Central Energy Plant at Fort Hood, TX. This opportunity is a Total Small Business Set-Aside by the Department of the Army. The response deadline for proposals is June 22, 2026.
Scope of Opportunity
The primary scope involves the construction of a Central Energy Plant, categorized under Product Service Code Y1JZ (Construction Of Miscellaneous Buildings). The specific details of the construction project are outlined in the original solicitation W9126G26RA020 and its subsequent amendments.
Key Amendments (from Amendment 0001)
Amendment 0001, issued on May 27, 2026, introduced several modifications to the original solicitation W9126G26RA020. While this notice is Amendment 0002, the provided details pertain to Amendment 0001. Key changes include:
- Revised Table of Contents.
- Updated Submittal Register: Section 32 31 13 (CHAIN LINK FENCES AND GATES) was removed, and Section 32 31 13.53 (HIGH-SECURITY FENCES (CHAIN LINK AND ORNAMENTAL) AND GATES) was added.
- Specification Updates:
- Added FAR 52.215-1 "Instructions to Offerors-Competitive Acquisition" to Section 00 21 00.
- Replaced Section 00 21 16 (INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS) and Section 26 20 00 (INTERIOR DISTRIBUTION SYSTEM).
- Deleted Section 07 27 36 (SPRAY FOAM AIR BARRIERS) and Section 32 31 13 (CHAIN LINK FENCES AND GATES).
- Added Section 32 31 13.53 (HIGH-SECURITY FENCES (CHAIN LINK AND ORNAMENTAL) AND GATES).
- Drawing Revisions:
- Drawing C-503 (PAVING DETAILS III) updated with Details G1 and L1.
- Drawing EP101 (POWER PLAN) updated to add a 480/277V 3-P 20A circuit for the air compressor and a safety disconnect.
- Drawing EP701 (PANEL SCHEDULE 1) updated to add a 480/277V 3-P 20A circuit for the air compressor.
Contract & Timeline
- Type: Solicitation (Design-Bid-Build RFP)
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- Response Due: June 22, 2026, 8:00 PM ET
- Published: June 9, 2026
Submission Requirements
Amendment 0001 did not extend the solicitation due date. Offerors must acknowledge receipt of all amendments. Any changes to submitted offers must reference the solicitation and amendment numbers.
Contact Information
For inquiries, contact Rodney Alexander at Rodney.d.alexander@usace.army.mil or 817-886-1090.