MINUTEMAN III SYSTEMS PROGRAM OFFICE - ECS Replacement Program
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Air Force, specifically the MINUTEMAN III Systems Program Office (SPO), is conducting market research through a Request for Information (RFI) for the Environmental Control Systems Replacement (ECSR) program. This effort supports the MMIII SPO at Hill Air Force Base, Utah. The purpose is solely to gather information and feedback from potential sources. Responses are due July 8, 2026.
Scope of Work
This RFI seeks to identify potential sources for the ECSR program requirements. Interested parties are requested to provide a main Point of Contact (POC) and Cage Code to receive copies of Controlled Unclassified Information (CUI) supporting documents, including:
- CUI ECS-R SOW 12 May 26
- CUI [DRAFT] GSLC SRD 20260529
- CUI [DRAFT] ECS-R SRD 20260529
Once security classification is cleared, these documents will be provided via DoDSafe.
Contract & Timeline
- Type: Sources Sought / Request for Information (RFI)
- Set-Aside: None specified
- Response Due: July 8, 2026, at 4:00 PM MT
- Published: June 8, 2026, at 4:13 PM MT
- Agency: DEPT OF DEFENSE / DEPT OF THE AIR FORCE / FA8214 AFNWC PZBB
- Place of Performance: Hill Air Force Base, UT
Evaluation
This RFI is solely for market research purposes to gather information and feedback. It does not constitute a solicitation or guarantee a future award.
Additional Notes
To receive the CUI supporting documents, interested parties must submit a main POC and Cage Code. Documents will be sent via DoDSafe after security clearance. Primary contact for this RFI is Heidi May (heidi.may.1@us.af.mil).