N--Minuteman National Historical Park- FARWELL JONES
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The National Park Service (NPS), under the Department of the Interior, is soliciting proposals for the replacement of a failed gas-fired boiler at the Farwell Jones House within Minuteman National Historical Park, Concord, MA. This is a Total Small Business Set-Aside with an estimated magnitude of less than $25,000.00. The project requires adherence to Davis-Bacon wage rates and specific construction administration policies. Proposals are due by 12:00 PM ET on January 23, 2026.
Scope of Work
The contractor will be responsible for the removal and disposal of the existing gas-fired cast iron boiler and associated mechanical components, followed by the installation of a new boiler that meets or exceeds the specifications of the current unit. This includes supplying all necessary labor, materials, equipment, and tools. The work must ensure minimal damage to existing plumbing, electrical, and structural systems. Key tasks include pressure testing the new heating system and providing operational training and documentation to the Contracting Officer's Representative (COR).
Specific clarifications from Amendment 0001 and RFIs:
- Taxes must be included in contractor estimates but will not be applied to government billing.
- No state, local, or federal permits are required.
- No known hazardous materials are associated with the project.
- The system requires commissioning to prove it is leak-free and capable of heating the building.
- The building will remain occupied throughout the construction period.
- Piping replacement is limited to corroded and rotten pipes within 5 feet and in direct contact with the boiler.
- Chimney inspection is a visual assessment of the flue/lining.
- Existing heating elements and thermostats on the first and second floors are to remain.
- No arc flash study is required for the electrical panel.
Contract Details
- Contract Type: Firm Fixed-Price (implied)
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: N045 (Installation Of Equipment: Plumbing, Heating, And Waste Disposal Equipment)
- Period of Performance: February 1, 2026, to April 2, 2026 (60 days)
- Place of Performance: Farwell Jones House, 955 Lexington Road, Concord, MA 01742
- Special Requirements: Contractor employees must possess Massachusetts Plumbing and Electrical Licensing, maintain full insurance, dispose of waste offsite, implement public safety measures, and coordinate work hours (M-F, 7 am - 5 pm) with the COR. No smoking is permitted, and park offices/restrooms are not available for contractor use. Compliance with Davis-Bacon Wage Determination MA20260004 is mandatory.
Submission & Evaluation
- Proposals Due: January 23, 2026, by 12:00 PM ET.
- Submission Method: Via email to Samuel McKenzie (Samuel_McKenzie@nps.gov). Proposals must be submitted in separate VOLUMES (I and II), with each email attachment not exceeding 30 MB.
- Evaluation Process: Lowest Price Technically Acceptable (LPTA) Source Selection Process. Technical evaluation will precede price evaluation.
- Eligibility: Offerors must be registered in SAM.gov and meet the small business size standard of $19.0 Million. Firms involved in developing the design or specifications are ineligible.
- Required Documentation: Documentation of relevant experience and past performance for at least three projects completed within the last five years.
- Site Visit: A site visit was scheduled for January 16, 2026, at 10:00 AM EDT at 955 Lexington Road, Concord, MA 01742.
- Pre-proposal Questions: Were due by 10:00 AM ET on January 19, 2026.