Mirror Benders

SOL #: RFP_360851(GN)Combined Synopsis/Solicitation

Overview

Buyer

Energy
Energy, Department Of
SLAC Natl Accel Lab -DOE Contractor
Menlo Park, CA, 94025, United States

Place of Performance

Place of performance not available

NAICS

Analytical Laboratory Instrument Manufacturing (334516)

PSC

Laboratory Equipment And Supplies (6640)

Set Aside

8(a) Set-Aside (FAR 19.8) (8A)

Timeline

1
Posted
Dec 18, 2025
2
Last Updated
Feb 10, 2026
3
Submission Deadline
Feb 3, 2026, 1:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

SLAC National Accelerator Laboratory, operated by Stanford University for the Department of Energy, is soliciting Firm Fixed-Price proposals for the fabrication, inspection, and delivery of eight (8) LCLS-II-HE Mirror Bender assemblies. This opportunity is an 8(a) Set-Aside for Small Businesses. Proposals are due by February 2, 2026, at 5:00 PM Pacific.

Scope of Work

The scope involves the fabrication (or procurement), inspection, and delivery of eight mirror bender assemblies and associated components for the Linac Coherent Light Source II High-Energy (LCLS-II-HE) project. These benders are critical for controlling bendable mirrors into specific elliptic, parabolic, and hyperbolic shapes, operating under Ultra-High Vacuum (UHV) conditions, and requiring active cooling. Key requirements include adherence to SLAC's UHV specifications (FP-202-631-14, SLAC-I-030-714-001-04), detailed quality assurance (QA) processes, and a comprehensive manufacturing schedule. Excluded from the subcontractor's responsibility are the mirrors, actuators, and thermal straps for each bender package. Final bender assembly will be completed at SLAC.

Contract Details & Deliverables

This will be a Firm Fixed-Price Subcontract. Deliveries for the eight mirror bender units are staggered: two units are targeted for delivery 24 months After Receipt of Order (ARO), two units at ARO+32 months, and the remaining four units at ARO+40 months. Domestic shipments are FOB Destination, while international shipments are CIP SLAC, Menlo Park, Duty Unpaid. Inspection will be performed by the subcontractor and SLAC, with final acceptance by SLAC after delivery.

Submission Requirements

Offerors must submit separate Technical and Business Proposals. The Technical Proposal (max 50 pages) should detail the ability to meet technical specifications, manufacturing and metrology capabilities, QA program, past performance, and a comprehensive schedule. The Business Proposal must include firm fixed prices (using Section B), financial information (Dun & Bradstreet report or audited statements), and acceptance of SLAC's Terms and Conditions. Mandatory forms include Representations and Certifications (US or International), and the Buy American Act Certification.

Key Dates & Contact

  • Request for Clarification Due: January 19, 2026
  • Proposal Due Date: February 2, 2026, 5:00 PM Pacific
  • Point of Contact: Giang Ngo (giangn@slac.stanford.edu, 6509263975)

Evaluation Criteria

Proposals will be evaluated based on technical requirements, manufacturing capabilities and capacity, metrology capabilities, quality assurance program, past performance, proposed schedule, price fairness and reasonableness, and financial stability. SLAC intends to award without discussions but reserves the right to conduct them.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 4
Combined Synopsis/Solicitation
Posted: Feb 10, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Jan 30, 2026
View
Version 2Viewing
Combined Synopsis/Solicitation
Posted: Jan 14, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Dec 18, 2025
View
Mirror Benders | GovScope