MMIII CABLE ASSEMBLY
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Defense Logistics Agency (DLA) Aviation at Ogden, UT is soliciting proposals for the MMIII CABLE ASSEMBLY. This opportunity is a Total Small Business Set-Aside for the procurement or manufacture of specific cable assemblies. Proposals are due by May 23, 2026.
Scope of Work
This solicitation requires the provision of 50 each of NSN: 6150-00-009-9603 AH and 50 each of NSN: 6150-00-435-6075 AH cable assemblies. Contractors are permitted to manufacture or source parts according to provided drawings, especially for components not obtainable from Flexible Metal Hose. Space Vector is noted as a previous manufacturer for the W5G cable (69D49203G3) and can be contacted for information on the 69D49223G3 assembly.
The work involves adherence to comprehensive Engineering Data Lists (EDLs) detailing components, specifications, and procurability information, including updated criticality codes (from 'X' to 'M') for both NSNs. The EDLs also provide insights into potential lead times (e.g., 340-360 days for some components) and approved alternative sources.
Key Deliverables & Requirements
- First Article Test Report (FATR) (Data Item A001), to be submitted concurrently with the First Article item.
- Counterfeit Prevention Plan (Data Item A002), with a draft due within 60 days of contract award and a final plan 15 days after government comments. This plan is critical for NIINs 004356075 and 000099603.
- Compliance with Unique Item Identifier (IUID) marking requirements.
- Participation in an On-Time Delivery (OTD) Improvement Initiative.
- Strict adherence to military packaging and marking standards, including MIL-STD-2073-1, MIL-STD-129, ISPM 15 for wood packaging, and ESD protective packaging for sensitive electronic components.
- Contractors must retain supply chain traceability documentation.
- Preparation and submission of Safety Data Sheets (SDS) per FED-STD-313 for hazardous materials.
Contract & Timeline
- Type: Solicitation (Request for Proposal)
- Set-Aside: Total Small Business Set-Aside (FAR 19.5)
- Response Due: May 23, 2026, 05:59 AM UTC
- Published: April 21, 2026
Evaluation
Proposals will be evaluated with Price or Cost as the most important factor, with all other factors being significantly less important. Costs associated with First Article testing will also be considered during evaluation.
Additional Notes
This opportunity involves handling Controlled Unclassified Information (CUI) and technical data subject to export control laws (Arms Export Control Act, Export Administration Act). Unmarked engineering drawings must be treated as having a "DISTRIBUTION D" statement, restricting distribution to DoD and US DoD contractors only. Bidders must understand the severe legal and contractual consequences of non-compliance.
Contact: Kody Quayle, kody.quayle@us.af.mil.