MMIII Cable Assembly, Spec
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Defense Logistics Agency (DLA) Aviation at Ogden, UT has issued a Solicitation for the procurement of 19 MMIII Cable Assemblies, Spec (NSN 6150-01-453-1163, Part Number 14161-402-1). This opportunity is a Total Small Business Set-Aside (FAR 19.5) and is open to U.S. Contractors Only. The deadline for proposal submissions has been extended to May 11, 2026.
Scope of Work & Key Requirements
This Request for Quotation (RFQ) requires the supply of specific cable assemblies, including:
- Item Unique Identification (IUID) and physical item markings per MIL-STD-130.
- First Article submission for specific items (0001AA, 0001AB, 0001AC, 0001AD), along with a First Article Test Report (CDRL A001, DI-NDTI-80809B/T).
- A Counterfeit Prevention Plan (CDRL A002, DI-MISC-81832), with an initial draft due within 60 days of award.
- Packaging and Marking in compliance with MIL-STD-129, ASTM-D-3951, MIL-STD 2073-1, ISPM 15 for wood packaging, and electrostatic discharge (ESD) control procedures.
- Adherence to detailed Engineering Data List (EDL) and Engineering Data Requirements (EDR) for components, materials, and manufacturing processes.
- The Statement of Work (SOW) further details requirements for preservation, packaging, and marking for military purposes, including hazardous materials handling.
Contract Details & Evaluation
The contract type is implied to be Firm Fixed Price, with prices required to be held firm for 120 days. Early and partial deliveries are acceptable. Evaluation will primarily focus on Price or Cost as the most important factor, with other factors being significantly less important. First Article Approval is a condition for award, with an evaluation cost of $1,500.00 for the first article. Payment will be processed through Wide Area WorkFlow (WAWF).
Submission & Deadlines
Quotations are due by May 11, 2026. Bidders must complete representations and certifications, potentially via SAM.gov. Multiple amendments have been issued, extending the due date and adding additional drawings. Bidders should review all amendments and associated documents, including those related to export-controlled technical data (Distribution D).
Contact Information
For inquiries, contact April Blakeley at april.blakeley@us.af.mil.