MN-AGASSIZ NWR-ROAD REHAB

SOL #: 140FC226Q0019Solicitation

Overview

Buyer

Interior
Us Fish And Wildlife Service
FWS, CONSTRUCTION A/E TEAM 3
Falls Church, VA, 22041, United States

Place of Performance

Place of performance not available

NAICS

Highway (237310)

PSC

Repair Or Alteration Of Highways/Roads/Streets/Bridges/Railways (Z2LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
May 5, 2026
2
Submission Deadline
May 21, 2026, 4:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The US Fish and Wildlife Service, under the Department of the Interior, is soliciting proposals for a Firm Fixed-Price Construction contract for Road Rehabilitation at the Agassiz National Wildlife Refuge in Middle River, Minnesota. This opportunity is a Total Small Business Set-Aside with an estimated value between $500,000 and $1,000,000.00. Proposals are due by May 21, 2026, at 12:00 pm EST.

Scope of Work

This project involves rehabilitating up to 10.14 miles of gravel roads across five specific segments within the Agassiz National Wildlife Refuge: Webster Trail, Northgate Road, Westgate Road, Northwest Pool, and Lost Bay Wildlife Drive. Key tasks include:

  • Webster Trail Road & Northgate Road: Removing existing gravel, installing geogrid, and spreading new Class V gravel with specific crowning for drainage.
  • Westgate Road & Northwest Pool Road: Spreading 2 inches of Class V gravel.
  • Lost Bay Wildlife Drive: Rebuilding road shoulders and ditch banks with clay fill, top-dressing with black dirt, re-establishing turf, and installing erosion control blankets. A detailed map (A06_Road_Rehab_Map.pdf) provides a visual representation of the project's physical scope and locations. Contractors must minimize soil disturbance and prevent the spread of invasive species. Note that the full scope of work may be adjusted based on budgetary constraints.

Contract Details

  • Contract Type: Firm Fixed-Price Construction.
  • Estimated Magnitude: Between $500,000 and $1,000,000.00.
  • Period of Performance: 150 days after notice to proceed, anticipated from May 25, 2026, to October 16, 2026.
  • Place of Performance: Agassiz National Wildlife Refuge, Middle River, Minnesota.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • Wage Determination: Applicable wage rates and fringe benefits for Marshall County, MN (MN20260070, dated 01/02/2026) are provided.

Submission & Evaluation

  • Proposal Submission: Must be submitted electronically via e-mail to christa_garrigas@ios.doi.gov.
  • Key Deadlines:
    • Questions regarding the solicitation are due by April 18, 2026.
    • Offers are due by May 21, 2026, at 12:00 pm EST.
  • Evaluation Criteria: Award will be made to the responsible offeror submitting the quotation with the lowest evaluated price determined fair and reasonable (price-only award).
  • Requirements: Offerors must submit a bid guarantee (20% of bid price or $3 million, whichever is less). Performance and Payment Bonds are required within 10 days of award.

Additional Notes

While a formal site visit will not be held, prior approval is required if an offeror desires one. Site visits prior to bidding are highly recommended per the Statement of Work. Contractors must notify listed contacts 48 hours prior to starting work, and all equipment must be cleaned pre and post-entry to prevent the spread of noxious/invasive species.

People

Points of Contact

Garrigas, ChristaPRIMARY

Files

Files

Download
Download
Download
Download

Versions

Version 1Viewing
Solicitation
Posted: May 5, 2026
MN-AGASSIZ NWR-ROAD REHAB | GovScope