Z--MN VLY NWR-HOGBACK LEVEE-FLOOD REPAIR

SOL #: 140FC226R0002Solicitation

Overview

Buyer

Interior
Us Fish And Wildlife Service
FWS, CONSTRUCTION A/E TEAM 2
Falls Church, VA, 22041, United States

Place of Performance

Place of performance not available

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Maintenance Of Other Conservation And Development Facilities (Z1KZ)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 9, 2026
2
Last Updated
Jun 15, 2026
3
Submission Deadline
Jul 10, 2026, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Fish and Wildlife Service (FWS), under the Department of the Interior, is soliciting proposals for Levee Repair Services at the Minnesota Valley National Wildlife Refuge in Bloomington, Minnesota. This opportunity, titled "Z--MN VLY NWR-HOGBACK LEVEE-FLOOD REPAIR," is a Total Small Business Set-Aside. The project involves rehabilitation of the Hogback Pond Dike and associated infrastructure. Proposals are now due by July 10, 2026.

Scope of Work

The project's base bid includes the rehabilitation of a 3,649-foot long dike, encompassing mobilization, demobilization, silt fence placement, vegetation removal, soil scarifying, transporting and compacting soil/clay fill, seeding, and adding filter fabric and riprap around a concrete water control structure. It also requires the removal of three corrugated pipe structures.

Optional Bid Additives include:

  • Additive #1: Replacement of a concrete pipe and end section with a new 24" diameter reinforced concrete pipe and flared end section, including associated site work.
  • Additive #2: Placement of 4-inch deep gravel along 3,916 feet of Hogback Dike Road.

Work hours are limited to between one-half hour before sunrise and one-half hour after sunset. Compliance with environmental regulations, hazardous materials handling, and use of products from mandatory environmental purchasing lists are required.

Contract Details

  • Contract Type: Firm Fixed-Price
  • Period of Performance: July 20, 2026, to January 28, 2028 (approximately 18 months)
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • NAICS: 237990 (Other Heavy and Civil Engineering Construction), Size Standard $45 Million
  • Product/Service Code: Z1KZ (Maintenance Of Other Conservation And Development Facilities)

Submission & Evaluation

Proposals must be submitted via email to christine_beauregard@ios.doi.gov. The evaluation will follow a Lowest Price Technically Acceptable (LPTA) process, assessing Technical Approach and Preliminary Schedule, Past Performance, and Price. Offerors must be registered and active in SAM.gov. Bond requirements apply for construction costs exceeding $35,000 and $150,000, and proof of insurance is required within five days of award.

Key Documents & Requirements

Bidders must complete a "Past or Present Performance Survey" form and the Bid Schedule for pricing. Prevailing wage rates (Davis-Bacon Act) for Heavy and Highway Construction Projects in specific Minnesota counties (Anoka, Carver, Chisago, Dakota, Hennepin, Ramsey, Scott, Washington) apply. Detailed drawings and specifications are available and critical for understanding the project scope.

Contact Information

For general inquiries, contact Rachel Williams at rachel_williams@fws.gov or 505-389-5972.

People

Points of Contact

Williams, RachelPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 4Viewing
Solicitation
Posted: Jun 15, 2026
Version 3
Solicitation
Posted: Jun 10, 2026
View
Version 2
Pre-Solicitation
Posted: May 27, 2026
View
Version 1
Sources Sought
Posted: Feb 9, 2026
View
Z--MN VLY NWR-HOGBACK LEVEE-FLOOD REPAIR | GovScope