Mobile Laundromat, Laundry Services- Tinian
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Air Force is conducting a Sources Sought to identify vendors capable of providing Mobile Laundromat or Local Laundry Services for personnel supporting recovery efforts on Tinian, CNMI. This is for market research purposes, and while not a request for quotes, estimated pricing will be accepted to inform future decisions. The primary requirement is for continuous, high-volume services to ensure hygiene and readiness for approximately 120 deployed personnel. Responses are due May 7, 2026.
Scope of Work
The requirement is for either a Turnkey Mobile Laundry Solution or Local Business Laundry Services. Both options must include all necessary equipment, personnel, maintenance, logistics, and supplies to operate continuously and scale with fluctuating troop levels. Self-service options are permitted, but the government will not maintain self-service equipment beyond normal cleaning operations. The services are needed due to insufficient local infrastructure.
Key Requirements / Deliverables
- Capacity: Process a minimum of 490 pounds of laundry per day with guaranteed turnaround.
- Frequency: Services must be provided a minimum of 3 times per week for full-service options.
- Hygiene: All items must be cleaned, dried, and sanitized to military and CDC standards.
- Reliability: Mobile units must maintain 95% uptime, with a rapid-response maintenance plan (12-hour repair/replacement).
- Environmental: Solutions should be efficient in water/power consumption and include compliant gray water/chemical waste management.
Contract & Timeline
- Type: Sources Sought (Market Research)
- Duration: Estimated 5-month period, with month-to-month extension options. Requires ten-day notice before work begins.
- Set-Aside: None specified.
- Response Due: May 7, 2026.
- Published: May 1, 2026.
- Place of Performance: San Jose, Tinian, United States.
Operating Constraints
Contractors must specify if their solution requires government-furnished water or power. Government support for utilities, hardstand, force protection, internet, or trash removal is not guaranteed.
Additional Notes
The Service Contract Act Wage Determination #2015-5693 applies to this effort, establishing minimum wage rates and fringe benefits for the region. This notice is for planning purposes only and does not constitute a formal solicitation.