Modular Building Replacement - Border Patrol Big Bend Marfa Sector HQ in Marfa, TX
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The General Services Administration (GSA), specifically the PUBLIC BUILDINGS SERVICE, has issued a Solicitation for the Modular Building Replacement project at the Border Patrol Big Bend Marfa Sector HQ in Marfa, TX. This opportunity is exclusively available to awardees of the small business construction MATOC in the Border McAllen area. The project entails the design and construction of two new modular buildings, alongside the demolition of three existing modular structures. Responses are due by July 2, 2026.
Scope of Work
The contracted services include:
- Design services for two new modular buildings.
- Construction services for two new modular buildings.
- Demolition of three existing modular buildings. This effort falls under Product Service Code Z2AA (Repair Or Alteration Of Office Buildings).
Contract & Timeline
- Opportunity Type: Solicitation
- Set-Aside: Limited competition for awardees of the small business construction MATOC in the Border McAllen area.
- Place of Performance: Marfa, TX, United States.
- Response Due: July 2, 2026, 10:00 PM UTC.
- Published Date: May 21, 2026.
Additional Information
This solicitation is managed by the PBS PROJECT DELIVERY CAPITAL CONSTRUCTION - BRANCH CENTRAL office. Prospective bidders should review all associated documents, including the Solicitation, Agreement, Statement of Work (SOW), Price Proposal Form, SF1442-22, Site Plan, Concept Floor Plans, and Wage Determination, for comprehensive details regarding the project requirements and submission process. The primary point of contact is Steven Steinkamp.