MOF Williams River at Tea Creek Bridge Replacement

SOL #: 12445526B0008Pre-Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA EAST 13
Atlanta, GA, 303092449, United States

Place of Performance

WV

NAICS

Highway (237310)

PSC

Construction Of Highways, Roads, Streets, Bridges, And Railways (Y1LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 1, 2026
2
Response Deadline
Apr 15, 2026, 2:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service has issued a Presolicitation for the MOF Williams River at Tea Creek Bridge Replacement project in the Monongahela National Forest, WV. This opportunity is designated as a Total Small Business Set-Aside with an estimated magnitude of $1,000,000 to $5,000,000. The official solicitation for this project is anticipated to be posted on or about April 15, 2026.

Scope of Work

The project primarily involves furnishing and installing a two-span box beam bridge system on FR 135 Tea Creek Campground. Key tasks and responsibilities include:

  • Construction survey and staking
  • Erosion and sediment control (E&S)
  • Clearing and grubbing
  • Installation of cofferdams and dewatering the site
  • Excavation for riprap placement
  • Removal of the existing structure
  • Installation of the new bridge structure
  • Micro piling design and installation
  • Roadway subbase and aggregate, asphalt cement, guardrail, and riprap armoring
  • Environmental activities: turbidity monitoring, in-channel perimeter control, fish relocation/removal, candy darter monitoring/capturing, and stream rehabilitation.

Contractors are responsible for furnishing all labor, supervision, equipment, materials, transportation, supplies, and incidentals. All equipment utilized must comply with State, Federal, and Local Laws.

Contract Details & Timeline

  • Opportunity Type: Presolicitation
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Estimated Magnitude: $1,000,000 - $5,000,000
  • NAICS Code: 237310 (Construction Of Highways, Roads, Streets, Bridges, And Railways)
  • Size Standard: $45 million
  • Bonds Required: Performance, payment, and bid guarantee
  • Anticipated Solicitation Post Date: April 15, 2026
  • Published Date: April 1, 2026

Agency & Contact

  • Department: Agriculture
  • Sub-Tier: FOREST SERVICE
  • Office: USDA-FS, CSA EAST 13
  • Primary Contact: Kevin Brown (kevin.brown2@usda.gov)

People

Points of Contact

Kevin BrownPRIMARY

Files

Files

No files attached to this opportunity

Versions

Version 1Viewing
Pre-Solicitation
Posted: Apr 1, 2026
MOF Williams River at Tea Creek Bridge Replacement | GovScope