Moller Upstream Enclosure
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of Energy (DOE), specifically Jefferson Lab, has issued a Solicitation (RFP/RFQ No. JSA-26-Q449836) for the fabrication and delivery of the MOLLER Upstream Enclosure. This opportunity is a Total Small Business Set-Aside and seeks qualified vendors to produce a critical component for the Thomas Jefferson National Accelerator Facility (TJNAF). Proposals are due by April 9, 2026, at 4:30 PM EST.
Scope of Work
This solicitation requires the procurement, fabrication, testing, and delivery of the MOLLER Upstream Enclosure, a welded vacuum chamber made of AL 6061 aluminum alloy. The enclosure, designed to maintain a vacuum of 1 x 10^-3 Torr, consists of a Top Hat and a Baseplate. Key requirements include:
- Fabrication of the Top Hat and Baseplate assemblies, including machining after welding.
- Compliance with ASME or AWS welding standards; welding must be performed by a JLab approved welding shop or existing approved vendor.
- Strict cleanliness standards for all parts, free of cutting oils, dust, and dirt.
- Material certification for all materials used.
- Comprehensive testing, including helium leak testing, vacuum testing, visual examination of welds, and dimensional inspection.
- Delivery of specific documentation, including Quality Control System Manual, Manufacturing Plan, NDE Procedures, Welding Procedures, and Certified Mill Test Reports.
Contract & Timeline
- Contract Type: Firm Fixed Price subcontract.
- Period of Performance: Delivery is required within 120 days after the date of subcontract award (or best delivery, no later than 26 weeks ARO).
- Set-Aside: Total Small Business Set-Aside (FAR 19.5).
- NAICS Code: 332710 (Miscellaneous Fabricated Nonmetallic Materials), Size Standard 500 employees.
- Place of Performance: Newport News, VA.
- Published Date: March 12, 2026.
- Questions Due: March 30, 2026.
- Proposals/Quotes Due: April 9, 2026, 4:30 PM EST.
- Site Visit: April 9, 2026 (recommended, not required).
Evaluation
Award will be made on a best value basis, considering factors such as capability (project management, past performance, experience, qualifications, compliance with instructions), project schedule, and price. Non-price factors are considered more important than price.
Eligibility / Special Requirements
- Offerors must be on the Jefferson Lab approved vendors list for welding fabrication or use an existing approved vendor.
- Electronic submission of proposals is required, following instructions in Attachment 1.
- Monthly written updates and notification of tests are required.
- A Kick-Off Meeting, Production/Work Readiness Review, and Pre-Shipping Review are mandatory.