Monaco D-21 Windows 11 Upgrades

SOL #: FA500026Q0016Combined Synopsis/SolicitationSole Source

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA5000 673 CONS LGC
JBER, AK, 99506-2501, United States

Place of Performance

EARECKSON AS, AK

NAICS

Other Communications Equipment Manufacturing (334290)

PSC

Hardware, Software, And Other Equipment For Tiered Or Enterprise Data Center Facilities That House And Protect Critical It Equipment. (7C20)

Set Aside

No set aside specified

Timeline

1
Posted
Apr 15, 2026
2
Submission Deadline
Apr 25, 2026, 12:00 AM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force intends to award a sole-source, Firm Fixed-Price Purchase Order to Monaco Enterprises, Inc. for Windows 11 technology upgrades on the D-21 Alarm Reporting System at multiple facilities across Joint Base Elmendorf-Richardson (JBER), AK. This is a combined synopsis/solicitation (RFQ FA5000-26-Q-0016) for commercial items. Questions are due by April 24, 2026, 4 PM AKST.

Scope of Work

The contractor shall furnish all personnel, equipment, supplies, and materials to perform Windows 11 technology upgrades on the D-21 Alarm Reporting System. Key requirements include:

  • CPU Replacement and Upgrade: Provide and install new CPUs (rack mount and tower), configure with the Base's current D-21 database, and upgrade to D-21 V2 software. Transfer existing software licenses and decommission old CPUs.
  • Network Switch Installation: Provide and install 24-port APL-approved network switches.
  • RDC III Installation: Provide and install RDC III units.
  • Monitor Installation: Provide and install replacement widescreen monitors for new CPU compatibility.
  • KVM Extender Installation: Provide and install Dual and Single KVM extenders.

Work will be performed at various locations including Fire Stations, Comm Rooms, EOCs, and Security Forces facilities at JBER.

Contract & Timeline

  • Type: Single Purchase Order, Firm Fixed-Price
  • Duration: Equipment delivery, installation, and training required within 360 days After Receipt of Order (ARO).
  • Set-Aside: Not a set-aside for small business concerns; unrestricted and classified as Other than Full and Open due to sole source justification.
  • Questions Due: April 24, 2026, 4 PM AKST.
  • Published: April 15, 2026.

Evaluation

This is a sole-source acquisition directed to Monaco Enterprises, Inc., justified under 41 U.S.C. 1901 due to proprietary software and the need for seamless integration with the existing D-21 system. Quotations from Monaco Enterprises, Inc. will be evaluated based on Price and Technical Acceptability. The government will award if the price is fair and reasonable and the offeror is technically acceptable.

Additional Notes

Market research indicated no other businesses capable of fulfilling the requirement. While this is a sole-source intent, the combined synopsis/solicitation is posted to SAM.gov to encourage other offerors to respond if their products/services fulfill the requirements. Vendors must ensure their representations and certifications are updated at www.sam.gov. The NAICS code is 334290 (Other Communications Equipment Manufacturing) with an 800-employee size standard.

People

Points of Contact

Edith SmithSECONDARY

Files

Files

Download
Download
Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: Apr 15, 2026