N--MORA TAHOMA WOODS FIBER OPTIC INSTALL

SOL #: 140P8326Q0014Solicitation

Overview

Buyer

Interior
National Park Service
PWR OLYM MABO(83000)
PORT ANGELES, WA, 98362, United States

Place of Performance

Place of performance not available

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

Installation Of Equipment: Miscellaneous (N099)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Feb 18, 2026
2
Last Updated
Mar 6, 2026
3
Submission Deadline
Mar 19, 2026, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Interior, National Park Service (NPS), is soliciting proposals for the installation of a fiber optic cable network in the Tahoma Woods area of Mount Rainier National Park, WA. This is a Total Small Business Set-Aside with an estimated value between $100,000 and $250,000. Proposals are due by March 19, 2026.

Scope of Work

This project involves the installation of an underground single-mode fiber optic (SMFO) passive FTTx feeder/distribution network to support a future Active Optical Network (AON) for the Tahoma Woods government housing area. Key tasks include:

  • Procurement and pulling of a 120-strand SMFO feeder cable.
  • Installation of underground cabling in existing or new conduit systems, including tracer wire and pull-tapes.
  • Installation of six subsurface vaults for mid-span access and splicing.
  • Supply and installation of a high-density rackmount ODF (120 fibers) in the Administration Building.
  • Installation of building entrance conduit and fiber patch panels for apartment buildings and single-family homes/trailer pads.
  • Installation of conduit and Ethernet cabling to predetermined Wireless Access Point (WAP) locations on apartment buildings.
  • End-to-end Tier 1 and Tier 2 testing of all installed fiber strands.
  • Submission of As-Built drawings, OTDR trace reports, and a final fiber termination map.

Contract Details & Timeline

  • Contract Type: Firm-Fixed-Price construction contract.
  • Set-Aside: Total Small Business (NAICS 238210, $19M size standard).
  • Estimated Value: $100,000 - $250,000.
  • Period of Performance: Anticipated award early to mid-April 2026. Work must commence within 10 calendar days of Notice to Proceed (NTP) and be completed within 45 days. The anticipated POP is 4/15/2026 to 7/15/2026.
  • Response Date: March 19, 2026, 22:00:00Z.
  • Questions Due: March 9, 2026, NOON PT.

Submission & Evaluation

  • Submission: Quotations must be submitted electronically via email to michael_abner@nps.gov. Required documents include SF 1442, acknowledgement of amendments, a completed lump sum price schedule, active SAM registration, and Section K representations/certifications.
  • Evaluation Factors: Price, Relevant Experience, Washington Contractor State License, Technical Approach, and Past Performance. Evaluation will follow simplified acquisition procedures (FAR Part 13.106).
  • Mandatory Requirements:
    • An active and current SAM.gov registration is required.
    • A Payment Bond and Liability Insurance are REQUIRED (Bid and Performance Bonds are NOT REQUIRED).
    • Adherence to Davis-Bacon Act wage rates for Pierce County, WA.
    • A 20-year minimum extended manufacturer's warranty is required for the optical fiber backbone cabling system.
    • A site visit was REQUIRED and held on March 4, 2026. Amendment 001 publishes the Q&A from this visit.

Additional Notes

This opportunity is for the PWR OLYM MABO(83000) office. The solicitation has been amended to include Q&A from the mandatory site visit.

People

Points of Contact

Abner, MichaelPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 3
Solicitation
Posted: Mar 6, 2026
View
Version 2Viewing
Solicitation
Posted: Mar 6, 2026
Version 1
Solicitation
Posted: Feb 18, 2026
View
N--MORA TAHOMA WOODS FIBER OPTIC INSTALL | GovScope