Moscow Research Station sewer line repair

SOL #: 1240LU26Q0072Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
NEZ PERCE-CLEARWATER NFS
GRANGEVILLE, ID, 83530, United States

Place of Performance

Moscow, ID

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

Repair Or Alteration Of Sewage And Waste Facilities (Z2ND)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 28, 2026
2
Last Updated
May 1, 2026
3
Submission Deadline
May 12, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Forest Service, Nez Perce-Clearwater National Forest, is soliciting proposals for sewer line repairs at the Rocky Mountain Research Station in Moscow, Idaho. This Total Small Business Set-Aside opportunity involves assessing, hydro-jetting, inspecting, excavating, and repairing approximately 150 feet of sewer line. An amendment has added site visit opportunities and visual documentation. Proposals are due by May 12, 2026.

Scope of Work

The project's objective is to address sewer line issues, specifically a leak from the East Greenhouse, at the Moscow Forestry Sciences Laboratory. The scope includes:

  • Assessing current site conditions to identify optimal solutions.
  • Hydro-jetting approximately 150 feet of affected sewer line to remove roots, sediment, and clogs.
  • Conducting a camera inspection to verify cleanliness and identify damaged areas.
  • Minimally excavating to access and repair broken sewer pipe(s).
  • Restoring excavated areas to pre-excavation conditions and properly disposing of waste.
  • Coordination with local utilities and personnel for facility access.

Contract Details

  • Type: Combined Synopsis/Solicitation (RFQ), anticipated Firm Fixed Price.
  • Magnitude: Estimated under $25,000.
  • Period of Performance: May 15, 2026, to June 15, 2026. The overall project period of performance is indicated as April 20, 2026, to October 1, 2026.
  • Place of Performance: 1221 S. Main St, Moscow, ID.
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5).
  • NAICS: 237110 (Water and Sewer Line and Related Structures Construction), with a size standard of $45 million.
  • Special Requirements: Contractor or subcontractor must hold a current plumber's license. Compliance with Davis-Bacon wage determinations (ID20260065) is required.

Submission & Evaluation

  • Quotations Due: May 12, 2026, by 1500 local time. Offers must be valid for 30 calendar days.
  • Questions Due: May 07, 2026, via email to john.curry@usda.gov.
  • Evaluation: Best value to the Government, based on a comparative analysis of:
    • Relevant Experience: Demonstrated ability to meet contract requirements.
    • Past Performance: Requires submission of a Past Performance Questionnaire for five relevant contracts within the last five years. An Experience Questionnaire is also required.
    • Price: Evaluated for fairness and reasonableness.

Site Visit & Attachments

An amendment (0001) has added site visit opportunities. Bidders must call Linda Bovard at 208-883-2334 to schedule in advance. Available times vary by day (Monday all day, Tuesday after 11 AM, Wednesday 10 AM-12 PM & 1:30 PM-5:30 PM, Thursday/Friday all day). The amendment also includes photos and drawings of the sewer line location. Other key attachments include a site plan, a Google photo for rough location, and a leak photo from a dye test.

Contact Information

Primary Contact: John Curry, john.curry@usda.gov, 605-673-9216.

People

Points of Contact

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 2Viewing
Combined Synopsis/Solicitation
Posted: May 1, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Apr 28, 2026
View
Moscow Research Station sewer line repair | GovScope