MSHA - Building 4 Wiring and Conduit Replacement Project
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Department of Labor (DOL), on behalf of the Mine Safety and Health Administration (MSHA), is issuing a Sources Sought / Request for Information (RFI) for the Building 4 Wiring and Conduit Replacement Project at MSHA’s Approval & Certification Center in Triadelphia, WV. This project is crucial for maintaining facilities where mining products are tested and certified, directly impacting miner safety. Responses are due May 22, 2026, at 2:00 PM EST.
Scope of Work
The project involves the removal of existing 500mcm wiring and associated conduit, followed by the installation of new conduit for power and control wiring from the power source to motor and control devices. This includes providing appropriately sized copper wire for a 100 HP motor, installing a new disconnect switch, and all necessary control wiring. The work also requires testing and startup procedures, ensuring proper operation of safety and emergency control devices. All tasks must comply with NFPA, OSHA, and NEC guidelines.
Contract & Timeline
- Type: Sources Sought / Request for Information (RFI). A Firm-Fixed Price contract is anticipated.
- NAICS Code: 238210 – Electrical Contractors and Other Wiring Installation Contractors.
- Set-Aside: None specified.
- Period of Performance: Work to be completed within 45 days of the start date, with the start occurring within 10 days after notice to proceed.
- Response Due: May 22, 2026, 2:00 PM EST.
- Published: May 15, 2026.
Industry Feedback Requested
Respondents are asked to provide input on technical comments, company experience in similar projects, recommendations for contract structure, potential performance/cost risks, key cost drivers, estimated performance schedule, appropriateness of the identified NAICS code, potential joint ventures, Service Contract Labor Standards applicability, innovative recommendations, and Rough Order of Magnitude (ROM) estimates.
Submission Details
Responses, including a Company Capabilities Statement, answers to feedback questions, business details (name, address, representative, type, size, socio-economic status), and DUNS Number, must be emailed to jackson.alicia.m@dol.gov and whiddon.michael.v@dol.gov. The subject line should be "RFI No. DOLC4-26-RFI-0004 – Building 4 Wiring and conduit replacement project."
Additional Notes
This RFI is for informational purposes only and does not constitute a solicitation. The government is not obligated to award a contract based on responses.