Multi Facility Doors
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Air Force (FA4897 366 CONS PKP) is soliciting proposals for the Multi Facility Door Replacement project at Mountain Home Air Force Base, ID. This Firm Fixed-Price contract, set aside for Total Small Businesses, involves the purchase and installation of various doors and associated hardware across multiple facilities. Proposals are due May 13, 2026, by 04:00 PM local time.
Scope of Work
This opportunity requires contractors to purchase and install aluminum/glass doors (e.g., Kawneer Trifab VersaGlaze, Oldcastle 3000) for storefront systems and hollow metal doors for personnel entrances. Key requirements include:
- Providing and verifying field measurements.
- Installing exterior storefronts with Aluminum Bronze Frames and 1" insulated Bronze tinted Low-e glass.
- Ensuring doors have a minimum 10" bottom rail.
- Equipping exterior doors with keyed locks accepting "BEST" cores and panic hardware.
- Installing push/pull hardware on interior doors (no locks).
- Mounting Bronze surface mount closers on all doors.
- Including thresholds, door sweeps, and weather stripping on exterior doors.
- Ensuring proper sealing around all door frames.
- Supporting MHAFB's recycling policy by removing and delivering old doors, hardware, and materials to building 1800 Recycle Center.
Specific door replacement details are provided for buildings including 198, 211, 512, 1126, 1300, 1361, 1613, 1784, 2316, and 2610, with some requiring airfield access (EAL). Attachment B provides photographic evidence of existing door and frame deficiencies, while Attachment C contains floor plans crucial for site assessment and planning.
Contract Details
- Contract Type: Firm Fixed Price
- Estimated Magnitude: Between $250,000 and $500,000
- Set-Aside: 100% Total Small Business Set-Aside (FAR 19.5)
- NAICS Code: 236220 (Repair Or Alteration Of Office Buildings)
- Size Standard: $45,000,000 Annual Receipts
- Period of Performance: 180 calendar days from Notice to Proceed (NTP), with performance to begin within 10 calendar days of NTP.
Submission & Evaluation
- Proposal Submission Deadline: May 13, 2026, by 04:00 PM local time.
- Offer Guarantee: Required.
- Evaluation Criteria: Award will be made to the responsible offeror whose proposal is most advantageous to the Government, considering price and past performance. The Government reserves the right to award to an offeror with a higher price if they demonstrate a more favorable past performance history.
General Requirements & Notes
Attachment A outlines critical general requirements, including the Contracting Officer's sole authority, procedures for contract commencement (surety bonds, NTP), progress reporting (AF Forms 3064/3065), submittals (AF Form 3000), coordination protocols, specified work hours and federal holidays, base access procedures (SFS Form 30, ID, restricted area access), personnel qualifications, contractor-led Quality Control (USACE CQM), RFI process, and site maintenance/waste disposal (including Foreign Object Debris prevention). Contractors must not begin construction until doors are on site and ready for installation.
Contact Information
- Primary Contact: Alexsia Best (alexsia.best@us.af.mil)
- Secondary Contact: Yan Hampp (yan.hampp@us.af.mil, 208-828-3870)