N--EO14398 ELECTRIC REPAIRS AT SIX ALASKAN N. PARKS

SOL #: 140P9726Q0046Pre-Solicitation

Overview

Buyer

Interior
National Park Service
ALASKA REGIONAL OFFICE(97000)
ANCHORAGE, AK, 99501, United States

Place of Performance

Place of performance not available

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

Installation Of Equipment: Electrical And Electronic Equipment Components (N059)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jun 11, 2026
2
Response Deadline
Jun 25, 2026, 9:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The National Park Service (NPS), under the Department of the Interior, has issued a Presolicitation for electrical repairs at six National Parks across Alaska. This Total Small Business Set-Aside opportunity seeks contractors to address identified electrical deficiencies. The response date is June 25, 2026.

Opportunity Details

  • Title: N--EO14398 ELECTRIC REPAIRS AT SIX ALASKAN N. PARKS
  • Type: Presolicitation
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: N059 - Installation Of Equipment: Electrical And Electronic Equipment Components
  • Department/Agency: Department of the Interior / National Park Service
  • Office: ALASKA REGIONAL OFFICE(97000)

Scope of Work

This Statement of Work (SOW) outlines requirements for general electrical repairs at six National Parks in Alaska, addressing deficiencies from previous building inspections. Key tasks include:

  • Initial site visits and field verification of dimensions.
  • Addressing electrical deficiencies detailed in Attachment 1 - Park Electrical Repairs.
  • Reporting any discrepancies or additional code-related issues to the Contracting Officer.
  • Providing adequate supervision and quality control.
  • All work must be performed or directly supervised by an individual holding an Alaska Electrical Administrator's License.

Period & Place of Performance

  • Period: Estimated from July 20, 2026, to August 19, 2027.
  • Location: Six National Parks within Alaska (KLGO, LACL, WEAR, BELA, GAAR, WRST).

Special Requirements

  • Compliance: Adherence to the latest editions of the National Electrical Code (NEC), applicable NFPA Codes, OSHA Regulations, National Electrical Installation Standards (NEIS), and all Federal, State, and Local laws.
  • Materials: All materials and equipment must be new, from reputable manufacturers, and listed/labeled by an approved national testing laboratory. Specific requirements for grounding conductors, ferrous metal, and NEMA-rated enclosures.
  • Workmanship: Neat, orderly, and secure installation.
  • Service Interruptions: Work on de-energized circuits; 2 days advance notice required for interruptions.
  • Site Conditions: Contractor responsible for locating utilities, repairing damaged utilities at their expense, and repairing any altered building surfaces.
  • Safety & Environment: Fire prevention, no storage of flammable liquids within 50 feet of structures, ventilation for volatile substances, nonsmoking policy within 50 feet of buildings.
  • Public Impact: Operations must minimize inconvenience to the public.

Submittals

  • Pre-performance Conference (within 10 days of award): Evidence of liability insurance, workman's compensation.
  • Pre-performance Conference (one week prior): Project Superintendent letter, Project Schedule, Accident Prevention Plan, list of Subcontractors (with SF1413), Quality Control Plan.
  • Shop Drawings, Product Data, Samples: At least one week in advance of proposed items.
  • Weekly Work Progress Reports: Electronic PDF reports with pictures.
  • Project Closeout: Cleaning, Substantial Completion certification, final inspection request, deficiency correction.

Contract Details

  • Quote Items: Base Item and Option Items (1-5) for specific park locations, based on Attachment 1, Fixed Price/Lump Sum.
  • Government Furnished Materials: None.
  • Contractor Furnished Materials: All tools and equipment.

Points of Contact

  • Contracting Officer: Ronald Bunch (ronald_bunch@nps.gov, 907-201-7719)
  • Point of Contact (SOW): Sue Lehmann, Alaska Regional Office

Invoicing

Invoices to be submitted via the Invoice Processing Platform (IPP), with copies to the COR and Contracting Office.

People

Points of Contact

Bunch, RonaldPRIMARY

Files

Files

Download

Versions

Version 1Viewing
Pre-Solicitation
Posted: Jun 11, 2026
N--EO14398 ELECTRIC REPAIRS AT SIX ALASKAN N. PARKS | GovScope