N--GC26 SCADA UPS REPLACEMENT

SOL #: 140R4026R0006Solicitation

Overview

Buyer

Interior
Bureau Of Reclamation
UPPER COLORADO REGIONAL OFFICE
SALT LAKE CITY, UT, 84138, United States

Place of Performance

Place of performance not available

NAICS

Electrical Contractors and Other Wiring Installation Contractors (238210)

PSC

Installation Of Equipment: Electrical And Electronic Equipment Components (N059)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Jan 15, 2026
2
Last Updated
Apr 23, 2026
3
Submission Deadline
Apr 27, 2026, 2:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Bureau of Reclamation, Upper Colorado Regional Office (Department of Interior) has issued a Solicitation for the replacement of the SCADA Uninterruptible Power Supply (UPS) at the Glen Canyon Dam in Page, Arizona. This project involves the demolition and removal of the existing UPS system and the installation of a new, modern system. This is a Total Small Business Set-Aside. Proposals are due by April 27, 2026, at 10:00 AM EDT.

Scope of Work

The scope includes the demolition and removal of the existing SCADA UPS system, associated components, and non-reused conduit and conductors. The contractor will then provide and install a new SCADA UPS system, including all necessary components, new conduit, and conductors. This encompasses all electrical modifications, terminations, labeling, testing, commissioning, and cutover to minimize downtime. Deliverables also include shop drawings, submittals, factory/start-up support, training for operations staff, acceptance testing, as-built documentation, O&M manuals, and warranty support. The new UPS must be a brand name or equal to Schneider Electric 480V UPS with External-Battery, meeting specific technical requirements detailed in the solicitation documents and electrical drawings.

Contract Details

This will be a Firm-Fixed-Price contract with an estimated magnitude between $1,000,000 and $5,000,000. The Period of Performance is 545 days from the Notice to Proceed. Performance and Payment Bonds are required. The Construction Wage Rate Requirements (Davis-Bacon), specifically Wage Rate Decision Number AZ20260007 for Coconino County, Arizona (Heavy Construction), will apply.

Submission & Evaluation

Proposals must be submitted electronically via email to Megan Swift (Megan_Swift@ios.doi.gov) by April 27, 2026, at 10:00 AM Eastern Daylight Time (EDT). The email subject line must be "Bureau of Reclamation Proposal: GCFD POWERPLANT UPS (SCADA EACSS) – 140R4026R0006". Award will be made using Best Value-Tradeoff evaluation procedures under FAR Part 15, considering factors such as price, technical capability (including project execution plan, schedule, and relevant experience), and past performance. Proposals must remain valid for 60 days.

Key Dates & Contacts

  • Site Visit: A site visit is strongly urged for April 9, 2026, at 8:30 AM Mountain Standard Time (MST) at the Bureau of Reclamation Carl Hayden Visitor Center in Page, Arizona. Attendees must confirm via email and bring mandatory PPE (safety boots, hard hats, safety vests). Amendment 0003 provides a list of site visit attendees.
  • Questions Due: April 15, 2026, at 10:30 AM EDT. Submit via email to Megan Swift. Answers will be provided via amendment.
  • Anticipated Award: July 1, 2026.
  • Primary Contact: Megan Swift, Contract Specialist, mswift@usbr.gov, 303-445-2722.

People

Points of Contact

Swift, MeganPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 7
Solicitation
Posted: Apr 23, 2026
View
Version 6Viewing
Solicitation
Posted: Apr 16, 2026
Version 5
Solicitation
Posted: Apr 3, 2026
View
Version 4
Solicitation
Posted: Apr 1, 2026
View
Version 3
Solicitation
Posted: Mar 27, 2026
View
Version 2
Pre-Solicitation
Posted: Mar 9, 2026
View
Version 1
Sources Sought
Posted: Jan 15, 2026
View