N041--CON-NRM-663A4-23-201 Replace 40 Ton Condenser BLDG 200
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of Veterans Affairs (VA), Network Contracting Office 20, has issued a Solicitation for the replacement of a 40-Ton Refrigerant Condenser at Building 200 of the VA Puget Sound Medical Center, American Lake Campus in Tacoma, WA. This is a 100% Service Disabled Veteran Owned Small Business (SDVOSB) Set-Aside. Proposals are due by March 25, 2026, 12:00 PM PST.
Scope of Work
The project involves the demolition, removal, and installation of a new 40-Ton Refrigerant Condenser, including associated apparatus and infrastructure such as condensate piping, refrigerant line-sets, evaporators, and the exterior walk-in freezer for Building 200. All materials must be new and installed per manufacturer instructions. The contractor is responsible for construction debris and hazardous waste disposal in accordance with VA, Federal, and State procedures. New installations must be compatible with existing BACnet communications protocol controls and the Building Automation System.
Contract Details
This will be a Firm-Fixed-Price contract. The Period of Performance is 249 calendar days from the Notice to Proceed, with work commencing within 10 calendar days of award. The NAICS code is 238220 (Plumbing, Heating, and Air Conditioning Contractors) with a $19 Million size standard. Requirements include a Bid Guarantee, Performance and Payment Bonds, and compliance with subcontracting limitations (not more than 85% of the amount paid by the government to non-SDVOSB firms for general construction, excluding materials). Adherence to VA Contractor Rules of Behavior, Infection Control Risk Assessment (ICRA), Pre-Construction Risk Assessment (PCRA), and Davis-Bacon wage rates for Pierce County, WA, are mandatory.
Submission & Evaluation
Proposals must be submitted electronically via email by March 25, 2026, 12:00 PM PST. The evaluation will utilize best value tradeoff source selection procedures, considering both non-price and price factors, including past performance as assessed via a Past Performance Questionnaire. A site visit was held on March 3, 2026, and questions were due by March 6, 2026. Offerors must acknowledge all amendments and complete Representations and Certifications via SAM.gov.
Key Dates
- Questions Due: March 6, 2026, 12:00 PM PST (Past)
- Proposals Due: March 25, 2026, 12:00 PM PST
Contact Information
- Primary: Ty Draszt, Contracting Officer (ty.draszt@va.gov, 360 553 7612)
- Secondary: Kaycee D Benson, Contractor (kaycee.benson@va.gov)