Narraguagus River Federal Navigation Project Maintenance Dredging

SOL #: W912WJ25BA010Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W2SD ENDIST NEW ENGLAND
CONCORD, MA, 01742-2751, United States

Place of Performance

Place of performance not available

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Construction Of Restoration Of Real Property (Public Or Private) (Y1QA)

Set Aside

No set aside specified

Timeline

1
Posted
Mar 17, 2025
2
Last Updated
Apr 18, 2025
3
Submission Deadline
Apr 17, 2025, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

The U.S. Army Corps of Engineers, New England District is issuing Invitation for Bids for the Narraguagus River Federal Navigation Project, located in Milbridge, Maine. This procurement is an Unrestricted Invitation for Bid (IFB). The NAICS code for the work is 237990 with a size standard of $37M. Construction is expected to take about five months to complete. The estimated construction cost is between $1,000,000 to $5,000,000. Any responsible source meeting this standard may submit a bid to be considered by the New England District. The Narraguagus River FNP consists of a 11-foot deep Mean Lower Low Water (MLLW), 150-foot-wide entrance channel, a 9-foot-deep MLLW, 100-foot-wide channel, a 6-foot-deep MLLW, 100-foot-wide channel, three 6-footdeep anchorages, two 9-foot-deep anchorages, an 11-foot-deep anchorage, and a 6-foot-deep turning basin. The proposed work consists of dredging approximately 150,000 cubic yards (CY) of predominately fined grained material from shoaled areas of the FNP channel and anchorage areas. The northeastern 6-ft anchorage is not part of the scope of this project and shall not be dredged. The shoaled areas within the project scope will be dredged to the authorized project depths, plus one foot of allowable overdepth. A mechanical dredge will remove material from the shoaled portions of the Narraguagus River FNP and transport the material via scows to the Douglas IslandDisposal Site (DIDS), approximately 2.5 miles away from the FNP.Dredging operations can start on November 1, 2024, for maintenance dredging using a mechanical dredge and placement in open water at DIDS. All work must be complete by April 1, 2025.In order to accomplish all dredging requirements within the specified dredging window the Contractor will need to meet a production rate of at least 40,000 CY per 30 consecutive calendar day period.

People

Points of Contact

Files

Files

Download
View
View
View
View

Versions

Version 5Viewing
Solicitation
Posted: Apr 18, 2025
Version 4
Solicitation
Posted: Apr 10, 2025
View
Version 3
Solicitation
Posted: Mar 26, 2025
View
Version 2
Solicitation
Posted: Mar 20, 2025
View
Version 1
Solicitation
Posted: Mar 17, 2025
View