NASIC DISTRICT COOLING PLANT

SOL #: W912QR26RA015Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W072 ENDIST LOUISVILLE
LOUISVILLE, KY, 40202-2230, United States

Place of Performance

OH

NAICS

Plumbing (238220)

PSC

Construction Of Miscellaneous Buildings (Y1JZ)

Set Aside

No set aside specified

Timeline

1
Posted
Nov 18, 2025
2
Last Updated
Mar 16, 2026
3
Submission Deadline
Mar 19, 2026, 3:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Army, W072 ENDIST LOUISVILLE, is soliciting proposals for the design and construction of a NASIC District Cooling Plant at Wright Patterson Air Force Base, OH. This is a Full and Open Procurement with a HUBZONE 10% Price Evaluation Preference. The estimated magnitude of construction is between $25,000,000.00 and $100,000,000.00. Proposals are due March 19, 2026, at 11:00 AM EST.

Scope of Work

This opportunity involves the design and construction of a new District Cooling Plant for the National Air and Space Intelligence Center (NASIC). The period of performance is 817 calendar days from the issuance of the Notice to Proceed. The project falls under NAICS Code 238220 (Commercial and Institutional Building Construction) with a size standard of $19,000,000.

Key Amendments & Changes

This solicitation has undergone several amendments, with Amendment 0004 being the latest:

  • Proposal Due Date: Extended to March 19, 2026, at 11:00 AM EST.
  • Revised Clause: FAR 52.236-27 has been revised.
  • Technical Revisions: Numerous specification sections and plan sheets have been revised or replaced. Key revised sections include General Environmental Protection, Special Security, Door Hardware, and Plumbing. Extensive updates to various plans cover site, grading, erosion control, utilities, electrical, fire suppression, landscape, mechanical, and structural elements.
  • Site Visit: An organized site visit is scheduled for February 26, 2026, following a Pre-Proposal Meeting. Attendees must RSVP by February 24, 2026, at 12:00 PM EST to John.P.Hearn@usace.army.mil. Electronic devices are prohibited.
  • Previous Amendments: Amendment 0003 removed requirements related to Paragraph 8.6 (Project Labor Agreement) and clauses 52.222-33 and 52.222-34. Amendment 0001 adjusted the Period of Performance to 817 calendar days.

Contract & Timeline

  • Contract Type: Solicitation (Request for Proposal)
  • Magnitude: $25,000,000.00 - $100,000,000.00
  • NAICS Code: 238220 (Size Standard: $19,000,000)
  • Set-Aside: Full and Open Procurement with HUBZONE 10% Price Evaluation Preference
  • Proposal Due: March 19, 2026, 11:00 AM EST
  • Published Date: February 11, 2026 (latest amendment published)
  • Place of Performance: Wright Patterson Air Force Base, OH

Contact Information

People

Points of Contact

Patrick DugginsSECONDARY

Files

Files

View
View
View
View

Versions

Version 10
Solicitation
Posted: Mar 16, 2026
View
Version 9
Solicitation
Posted: Feb 24, 2026
View
Version 8
Solicitation
Posted: Feb 17, 2026
View
Version 7Viewing
Solicitation
Posted: Feb 11, 2026
Version 6
Solicitation
Posted: Jan 21, 2026
View
Version 5
Solicitation
Posted: Jan 7, 2026
View
Version 4
Solicitation
Posted: Dec 18, 2025
View
Version 3
Solicitation
Posted: Dec 11, 2025
View
Version 2
Solicitation
Posted: Dec 11, 2025
View
Version 1
Pre-Solicitation
Posted: Nov 18, 2025
View
NASIC DISTRICT COOLING PLANT | GovScope