Natural Gas Valve Bi-Annual Exercising Services

SOL #: SM-377651Solicitation

Overview

Buyer

Energy
Energy, Department Of
FERMILAB - DOE CONTRACTOR
Batavia, IL, 60510, United States

Place of Performance

IL

NAICS

Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance (811310)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Plumbing, Heating, And Waste Disposal Equipment (J045)

Set Aside

No set aside specified

Timeline

1
Posted
Mar 4, 2026
2
Submission Deadline
Apr 3, 2026, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of Energy (DOE), through FERMILAB - DOE CONTRACTOR (Fermi Forward Discovery Group - FFDG), is soliciting proposals for Natural Gas Valve Bi-Annual Exercising Services at the Fermi National Accelerator Laboratory in Batavia, IL. This Firm Fixed-Price subcontract requires a vendor to perform bi-annual greasing and exercising of 130 underground natural gas valves, along with associated maintenance and reporting. Proposals are due by April 3, 2026, at 5:00 PM CST.

Scope of Work

The selected subcontractor will be responsible for:

  • Bi-annual greasing and exercising of 130 underground steel natural gas valves within valve boxes.
  • Painting valve covers and labeling valve boxes as needed.
  • Reporting non-functioning valves or maintenance issues to the FFDG Subcontracting Officer (SC).
  • Providing detailed reports for each exercised valve, including date/time, valve position, and amount of grease added.
  • Scheduling all maintenance and outages with the FFDG SC.
  • Ensuring all labor, materials, equipment, supervision, safety compliance, and coordination are provided. Materials require prior approval.
  • Compliance with applicable industry standards, FFDG safety standards, manufacturer recommendations, and utility best practices.
  • Maintaining a comprehensive safety program compliant with OSHA, DOE, FFDG, and state/local gas utility regulations.
  • Adhering to extensive Environment, Safety, and Health (ES&H) requirements, including specific hazard controls and reporting.
  • Developing and implementing a Project Quality Control (PQC) Plan, and providing a Corporate Quality Assurance Plan with the bid.

Contract Details

  • Contract Type: Firm Fixed Price
  • Period of Performance: One base year (estimated May 4, 2026 – May 3, 2027) with two one-year option periods.
  • Set-Aside: None (Unrestrictive acquisition)
  • NAICS Code: 811310 (Commercial and Industrial Machinery and Equipment Repair and Maintenance)
  • Small Business Size Standard: $12.5 Million
  • Place of Performance: Fermi National Accelerator Laboratory, Batavia, IL 60510 (across Kane and DuPage counties).

Submission & Evaluation

  • Proposal Due Date: April 3, 2026, by 5:00 PM CST.
  • Submission Method: Email to smercil@fnal.gov. The official Proposal Form (Exhibit 8) must be completed and submitted with the written proposal.
  • Questions Due: Written explanations or interpretations must be requested by March 20, 2026, 5:00 P.M. CST.
  • Evaluation Criteria: "Best value" using a Tradeoff evaluation process. Technical Factors (Experience, Approach, Safety, Reporting) are as important as Price and Past Performance. Proposals must be submitted in two parts: Technical Proposal and Pricing Proposal.
  • Required Certifications: Offerors must complete various certifications, including Proposal Certifications (Exhibit 7) and Subcontractor Annual Representations & Certifications (SARC - Exhibit 6), and comply with specified insurance requirements (Exhibit 5). Wage Determinations (Exhibits 9a & 9b) for DuPage and Kane counties, IL, are applicable.

Additional Notes

Subcontractor employees must comply with Fermilab's Real-ID Requirements, undergo FFDG's Subcontractor Orientation and CUB Training. Any exceptions or deviations to the RFP must be identified and explained.

People

Points of Contact

Seth MercilPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 1Viewing
Solicitation
Posted: Mar 4, 2026
Natural Gas Valve Bi-Annual Exercising Services | GovScope