NBPL Conex HVAC 150KW Heater
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, specifically the Portsmouth Naval Shipyard (PNSY), is soliciting proposals for the rental and service of temporary Conex HVAC and 150KW Heater units for Naval Base Point Loma in San Diego, CA. This opportunity is designated as a Total Small Business Set-Aside. Proposals are due by June 5, 2026, at 3:00 PM EST.
Scope of Work
This requirement is for the lease and comprehensive service of climate control equipment for a temporary structure. Key components and services include:
- Equipment: A 25 Ton HVAC unit (with DX Cooling, 72kW Electric Heat, MERV 8 filtration, 480V), a 150KW Electric Fan Coil Heater (7000 CFM, 480 VAC), 300 FT of 20 IN Dia. Flex Duct, and 300 FT of Electrical Power Cable. Detailed technical specifications are provided in the Vendor Compliance Checklist.
- Services: Weekly inspection and preventative maintenance, equipment start-up and commissioning, training for Shipyard personnel on operation and setup, and ongoing technical support.
- Deliverables (CDRLs): Required data items include an Equipment Technical Manual, Contractor's Personnel Roster, a Maintenance Support Plan (with schedules), and weekly Maintenance Service Reports.
Contract & Timeline
- Type: Combined Synopsis/Solicitation (Request for Quote - RFQ). The solicitation is issued as "All or None."
- Period of Performance: A base period from July 20, 2026, to July 18, 2027 (52 weeks), with two option periods: Option 1 (9 weeks) and Option 2 (4 weeks).
- Set-Aside: Total Small Business Set-Aside (FAR 19.5).
- NAICS Code: 332311 (Prefabricated Metal Building and Component Manufacturing) with a 750-employee size standard.
- Response Due: June 5, 2026, 3:00 PM EST.
- Published: May 3, 2026.
Evaluation
Award will be based on Best Value Price, considering three factors:
- Technical Acceptability: Proposals must meet all specified equipment and service requirements and demonstrate capabilities.
- Experience/Past Performance: Bidders must provide documentation for two recent and relevant projects.
- Price: Will be evaluated for reasonableness, and supporting documentation may be requested.
Key Considerations for Bidders
- Vendors must be actively registered in the System for Award Management (SAM).
- Compliance with the Service Contract Act Wage Determination (WD # 2015-5635, Revision 30) for San Diego, CA, is mandatory for all labor costs.
- Strict adherence to Operations Security (OPSEC) requirements, including protection of Critical Information and Controlled Unclassified Information (CUI), and Portable Electronic Device (PED) policies, is required during contract performance.
- Purchase card orders may be utilized for payments up to $100,000.
Contact Information
For inquiries, contact Sarah Thibodeau at sarah.d.thibodeau.civ@us.navy.mil or 207-994-4897.