Y--ND-TEWAUKON NWR-REPLACE WATER DISTRIBUTION SYSTEM

SOL #: 140FC126R0005Award Notice

Overview

Buyer

Interior
Us Fish And Wildlife Service
FWS, CONSTRUCTION A/E TEAM 1
Falls Church, VA, 22041, United States

Place of Performance

Place of performance not available

NAICS

Water and Sewer Line and Related Structures Construction (237110)

PSC

Construction Of Water Supply Facilities (Y1NE)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 11, 2026
2
Last Updated
Jun 5, 2026

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The U.S. Fish and Wildlife Service is soliciting proposals for the replacement of the water distribution system at Tewaukon National Wildlife Refuge (NWR) in North Dakota. This is a 100% Total Small Business Set-Aside for a Firm Fixed Price construction contract. The estimated magnitude of construction is between $100,000 and $250,000. Proposals are due April 10, 2026.

Scope of Work

This project, identified as #23-224-006, requires a complete replacement of the aging and failing water distribution system at the Tewaukon NWR main campus. Key tasks include:

  • Removal of the existing system, including 9 curb stops and 3 yard hydrants.
  • Installation of new water system components: 74 feet of 2" water main, 1512 feet of 1-1/2" water main, 550 feet of 1" water service line, 7 new curb stops, and 1 new yard hydrant.
  • Connections to existing stub outs or meters and the existing water system outside the building foundation.
  • Work involves selective site demolition, cast-in-place concrete, domestic water piping, earthwork (clearing, excavation, fill, compaction), gravel surfacing, and directional drilling.

Contract Details

  • Contract Type: Firm Fixed Price
  • Estimated Magnitude: Between $100,000 and $250,000
  • Period of Performance: 120 calendar days from Notice to Proceed (NTP), with performance to begin within 10 calendar days of NTP. Anticipated performance period is May 1, 2026 to August 31, 2026.
  • NAICS Code: 237110 - Water and Sewer Line and Related Structures Construction
  • Small Business Size Standard: $45.0 Million
  • Bonds: Performance and Payment Bonds, and a Bid Guarantee are required.

Submission & Evaluation

  • Proposal Submission Deadline: Friday, April 10, 2026, by 5:00 PM EDT.
  • Submission Method: Via email to john_ferrall@fws.gov. The subject line must read: "Proposal Submission-140FC126R0005".
  • Request for Information (RFI) Deadline: March 27, 2026, by 5:00 PM EDT. Questions must be submitted in writing via email to john_ferrall@fws.gov. Inquiries received after this date may not receive a response.
  • Evaluation Criteria: Lowest-Price Technically Acceptable (LPTA) as detailed in FAR 15.101-2. Evaluation will be based on price and technical acceptability, considering factors like field work capabilities, ability to meet deadlines, and locality.
  • Site Visit: Highly recommended and encouraged. Contact Keith Frankki at (701) 724-5707 or keith_frankki@fws.gov to schedule.

Eligibility & Requirements

  • Set-Aside: 100% Total Small Business Set-Aside.
  • SAM Registration: Offerors must be registered in the System for Award Management (SAM) prior to award.
  • Wage Determination: Bidders must adhere to the prevailing wage rates and fringe benefits specified in Wage Determination ND20260036 for construction trades in relevant North Dakota counties, including compliance with Executive Orders 13706 (Paid Sick Leave) and 13658 (Minimum Wage).
  • Required Submittals: Technical and Cost Proposals (with breakouts for materials, equipment, and field work), construction schedule, material specifications (e.g., concrete, PE pipe, fittings), certifications, and operating/maintenance manuals.

Contact Information

People

Points of Contact

Ferrall, JohnPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download

Versions

Version 2Viewing
Award Notice
Posted: Jun 5, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Mar 11, 2026
View
Y--ND-TEWAUKON NWR-REPLACE WATER DISTRIBUTION SYSTEM | GovScope