New Laundry Facility at Holston Army Ammunition Plant

SOL #: W9123625R4000Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W2SD ENDIST NORFOLK
NORFOLK, VA, 23510-1096, United States

Place of Performance

Place of performance not available

NAICS

Industrial Building Construction (236210)

PSC

Construction Of Other Industrial Buildings (Y1EZ)

Set Aside

No set aside specified

Timeline

1
Posted
Mar 25, 2025
2
Last Updated
Jul 18, 2025
3
Submission Deadline
Jul 18, 2025, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

The USACE Norfolk District has a requirement from the JPEOAA to provide design and construction of a new Laundry Facility at the Holston Army Ammunition Plant (HSAAP).HSAAP is a Government-Owned, Contractor Operated (GOCO) explosives production facility located in Kingsport, TN. HSAAP depends on an onsite Laundry Facility to support routine and specialty laundering requirements of a variety of worker garments and production area fabrics utilized in conjunction with explosives production operations. The new Laundry Facility will house new and relocated laundry equipment. Laundry equipment will comprise of a scale, hot water tank(s) with controls, several washer/extractors, and dryers. In addition to the equipment area, the new building will include cutting and sewing rooms, clothing storage, bathrooms, a separate boiler room (as required) and breakroom. Ramps and loading dock are required for safe transport of wheeled buggies within the building and to/from change houses. The DB Contractor will be responsible for obtaining all necessary permits for the project.

People

Points of Contact

Files

Files

View
View
View
View

Versions

Version 4Viewing
Solicitation
Posted: Jul 18, 2025
Version 3
Solicitation
Posted: Apr 22, 2025
View
Version 2
Solicitation
Posted: Apr 18, 2025
View
Version 1
Solicitation
Posted: Mar 25, 2025
View