Newland VLT Z-Axis Replacement Alignment

SOL #: FA812626R0001Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA8126 AFSC PZIMB
TINKER AFB, OK, 73145-3305, United States

Place of Performance

S Coffeyville, OK

NAICS

Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance (811310)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Maintenance And Repair Shop Equipment (J049)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Mar 19, 2026
2
Submission Deadline
Apr 1, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting quotes for a one-time contract repair of a Newland Vertical Turret Lathe (VLT) CNC Turning and Milling Center at the Oklahoma City-Air Logistics Complex (OC-ALC), Tinker Air Force Base, OK. This Total Small Business Set-Aside opportunity aims to address an out-of-tolerance Z-axis on the Newland NTG15.01 machine. Quotations are due April 1, 2026, at 2:00 PM CST.

Scope of Work

The contractor will provide all necessary labor, tools, equipment, materials, and parts for the repair. Key tasks include:

  • Conducting squareness and yaw checks of the Z-Axis.
  • Disassembling and reassembling the Z-Axis.
  • Removing and cleaning existing linear rails and bearing trucks.
  • Installing new customer-supplied linear rails and bearing trucks.
  • Performing final testing to ensure proper functionality.
  • The contractor is responsible for supplying one set of Z-axis slider pre-assembled parts.
  • "Over and Above" (O&A) work is permissible if within scope and necessary, following DFARS 252.217-7028.

Contract Details

  • Contract Type: Firm Fixed Price
  • Period of Performance: 5 months After Receipt of Order (ARO)
  • Set-Aside: 100% Small Business Set-Aside (FAR 19.5)
  • NAICS Code: 811310 (Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance)
  • Product Service Code: J049 (Maintenance, Repair And Rebuilding Of Equipment: Maintenance And Repair Shop Equipment)
  • Place of Performance: On-base at the Oklahoma City-Air Logistics Complex (OC-ALC), Tinker AFB, OK.
  • Hours of Operation: Monday through Friday, 07:00 am to 04:00 pm.

Submission & Evaluation

  • Quotations Due: April 1, 2026, at 2:00 PM Tinker AFB OK Central Standard Time (CST).
  • Submission Requirements: Vendors must "wet" sign/date page 2, fill in vendor information, delivery, and pricing on page 3 of the solicitation. A company quotation sheet with adequate documentation demonstrating compliance is required. Emailed quotations are preferred.
  • Evaluation Criteria: Award will be based on the lowest evaluated price among technically acceptable offers. Price is the sole evaluation factor. Vendors must be authorized to perform repairs on proprietary equipment.
  • Eligibility: Vendors must be registered in the System for Award Management (SAM) database.

Special Requirements & Notes

Contractor personnel must be technically trained and experienced. Compliance with environmental protection, safety regulations (including HAZMAT, SDS), and security/OPSEC briefings is mandatory. Specific training (FOD/DOP Awareness, Fire Safety, Environmental Accountability, Energy Management Systems) is required. A Contract Manager (CM) with full authority must be designated. Bidders must also adhere to the Service Contract Act wage determinations for Oklahoma.

People

Points of Contact

Michael Chappell Jr.PRIMARY
Kyle NewcombSECONDARY

Files

Files

Download
Download
Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: Mar 19, 2026
Newland VLT Z-Axis Replacement Alignment | GovScope