Next Gen High Pressure Cold Spray System

SOL #: FA813226Q0029Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA8132 AFSC PZIMC
TINKER AFB, OK, 73145-3303, United States

Place of Performance

S Coffeyville, OK

NAICS

Other Measuring and Controlling Device Manufacturing (334519)

PSC

Weapons Maintenance And Repair Shop Specialized Equipment (4933)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 14, 2026
2
Last Updated
May 14, 2026
3
Submission Deadline
May 22, 2026, 5:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The Department of the Air Force is soliciting proposals for a Next Gen High Pressure Cold Spray System for its facility in S Coffeyville, OK. This is an all-or-nothing RFQ for a complete system, including installation and site work. The acquisition is a Total Small Business Set-Aside. Quotes are due May 22, 2026, by 12:00 PM CDT.

Scope of Work

This solicitation requires the procurement, integration, installation, and training for a comprehensive High Pressure Cold Spray System. Key components include:

  • Impact Innovation EvoCSII Cold Spray Machine (Brand Name)
  • Fanuc M-710iC/50 Industrial Robot (Brand Name)
  • HiWatch HR2 Particle Measurement System (Brand Name)
  • ReliaCoat ICP-8 In-Situ Coating Property Sensor (Brand Name)
  • Nitrogen Supply System (99.999% purity, 105 scfm, 1500psig)
  • Argon Fire Suppression System
  • Dust Handler/Collector (modification of existing)
  • High-Pressure Gas Plumbing
  • Ancillary equipment, system integration, installation, and training.

Substitute/Equal items are not permitted for the specified brand-name components. The system is intended to industrialize cold spray repair technology for engine sustainability. Existing site assets, such as the spray booth and dust collector, will be reused and modified. The contractor is responsible for installing high-pressure tubing for Helium from the existing supply.

Contract Details

  • Contract Type: Firm Fixed Price (FFP)
  • Set-Aside: Total Small Business Set-Aside (FAR 19.5)
  • NAICS Code: 334519 (Non-Manufacturing Rule applies)
  • Place of Performance: S Coffeyville, OK
  • Installation: May be delayed up to 18 months due to coordination with Tinker AFB Civil Engineering.
  • Shipping: FOB Destination only (Tinker AFB, OK).
  • Payment Terms: Net 30.

Submission & Evaluation

  • Evaluation Factor: Lowest total price. Award will be made to the responsible Offeror with the lowest total evaluated price whose offer conforms to all solicitation requirements, including Brand Name components.
  • Quotes Due: May 22, 2026, by 12:00 PM Central Daylight Time.
  • Quote Validity: Offers must be good for at least 90 days.
  • Submission Method: Offers must be submitted in Wide Area Workflow (WAWF).
  • Registration: Offerors must be registered in SAM.gov prior to quoting.

Important Notes

The Statement of Work (SOW) has been updated via Amendment 02. Vendor-submitted Questions and Answers have also been posted, clarifying details on existing assets, gas supply, and foundation requirements. A site visit was scheduled for May 7th, 2026.

People

Points of Contact

Kylie McMichaelPRIMARY
Marc J. KreienbrinkSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download

Versions

Version 7
Combined Synopsis/Solicitation
Posted: May 14, 2026
View
Version 6
Combined Synopsis/Solicitation
Posted: May 14, 2026
View
Version 5Viewing
Combined Synopsis/Solicitation
Posted: May 6, 2026
Version 4
Combined Synopsis/Solicitation
Posted: Apr 30, 2026
View
Version 3
Combined Synopsis/Solicitation
Posted: Apr 20, 2026
View
Version 2
Combined Synopsis/Solicitation
Posted: Apr 20, 2026
View
Version 1
Combined Synopsis/Solicitation
Posted: Apr 14, 2026
View
Next Gen High Pressure Cold Spray System | GovScope