NFSR 141 Paving Project

SOL #: 127EAX26R0008Combined Synopsis/Solicitation

Overview

Buyer

Agriculture
Forest Service
USDA-FS, CSA SOUTHWEST 7
Albuquerque, NM, 871023498, United States

Place of Performance

Reserve, NM

NAICS

Highway (237310)

PSC

Repair Or Alteration Of Highways/Roads/Streets/Bridges/Railways (Z2LB)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 30, 2026
2
Last Updated
Jun 1, 2026
3
Submission Deadline
Jun 5, 2026, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The USDA Forest Service is soliciting proposals for the NFSR 141 Paving Project, involving rehabilitation and maintenance of National Forest System Road (NFSR) 141 in the Gila National Forest, Reserve, NM. This is a Total Small Business Set-Aside. Proposals are due by June 5th, 2026, at 1:00 PM Central Daylight Time.

Scope of Work

This project entails pulverizing the existing chip seal surface (6" depth) and reshaping the road template along NFSR 141 from milepost 0.69 to 18.81. Work also includes maintaining, extending, repairing, installing, and/or removing culverts; reconditioning ditch lines; clearing roadside vegetation; and installing new sign systems. The base contract covers applying a 3" asphalt layer over a 4" aggregate base for the segment from milepost 0.69 to 9.47. Optional items, funded if available, include adding a 4" aggregate surface course for the remaining 9.34 miles, applying a dust palliative, and applying a fog seal followed by a single penetration chip seal.

Contract Details

  • Contract Type: Combined Synopsis/Solicitation, Request for Proposal (RFP)
  • Set-Aside: Total Small Business Set-Aside
  • NAICS: 237310 (Highway, Street, and Bridge Construction) with a $45M size standard
  • PSC: Z2LB (Repair Or Alteration Of Highways/Roads/Streets/Bridges/Railways)
  • Period of Performance: 270 calendar days upon Notice to Proceed (anticipated 06/15/2026 to 03/15/2027)
  • Place of Performance: Gila National Forest, Reserve Ranger District, Catron County, New Mexico

Key Requirements & Considerations

Work must conform to "Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14" and Forest Service Supplemental Specifications (FSSS). The contractor is responsible for furnishing all materials, equipment, labor, transportation, and supplies. Key requirements include developing a Traffic Control Plan (TCP) compliant with MUTCD, maintaining one lane open for emergency access, and managing full road closures (Mon-Fri, 6 AM-6 PM, with potential full-day Tue/Wed for paving). The contractor must locate and secure their own water source and coordinate with Catron County regarding their scheduled roadway project on NM State Highway 435. Davis Bacon wages apply. Clarifications from the Q&A include that NFSR 94 is an alternate route, Average Daily Traffic (ADT) is approximately 70, winter work is permitted if quality is maintained, and the project is tax-exempt with no permitting required.

Submission & Evaluation

  • Site Visit: May 18th, 2026, at 10:00 AM Local Time
  • Requests for Information (RFIs) Due: May 25th, 2026, by 1:00 PM Central Daylight Time
  • Proposals Due: June 5th, 2026, by 1:00 PM Central Daylight Time
  • Submission: Electronically to troy.mccullough@usda.gov
  • Evaluation Factors: Technical Approach (Work Plan/Capability, Key Personnel, Performance Schedule), Price, and Past Performance. Award will be made to the highest technically rated offeror with fair and reasonable pricing and acceptable or neutral past performance; tradeoffs will not be conducted.

Contact Information

Primary Point of Contact: Troy A. McCullough (troy.mccullough@usda.gov)

People

Points of Contact

Troy A. McCulloughPRIMARY

Files

Files

Download
Download
Download
Download
Download
Download
Download
Download
Download
Download
Download

Versions

Version 2Viewing
Combined Synopsis/Solicitation
Posted: Jun 1, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Apr 30, 2026
View
NFSR 141 Paving Project | GovScope