Nicolet iS50 Maintenance

SOL #: FA822726Q3002Combined Synopsis/Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Air Force
FA8227 AFSC OL H PZIM
HILL AFB, UT, 84056-5805, United States

Place of Performance

Place of performance not available

NAICS

Electronic and Precision Equipment Repair and Maintenance (811210)

PSC

Maintenance, Repair And Rebuilding Of Equipment: Instruments And Laboratory Equipment (J066)

Set Aside

No set aside specified

Timeline

1
Posted
Dec 8, 2025
2
Last Updated
Dec 8, 2025
3
Submission Deadline
Dec 5, 2025, 10:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

SINGLE SOURCE TO Thermo Electron North America LLC

The 809th Maintenance Support Squadron (809th MXSS) has a requirement for a for a full service maintenance, repair, support for the Nicolet iS50.  located in Building 100 Bay "E". The iS50 is a complex laboratory analytical instrument and requires specific training, tools and parts that are not available organically and must be repaired by fully trained technicians. Technicians will be required to repair the instrument to meet or exceed original OEM specifications.

This requirement is for one (1) base year and four (4) one (1) year options.

  1. Delivery/Period of Performance:

  • FOB Destination delivery terms shall apply.
  • Period of Performance: 6 Feb 2026 - 5 Feb 2031
  • Location: Hill AFB

People

Points of Contact

Nichole SaucedoPRIMARY
Lauren ReigenbornSECONDARY

Files

Files

Download
Download
Download
Download
Download
Download
Download

Versions

Version 2
Combined Synopsis/Solicitation
Posted: Dec 8, 2025
View
Version 1Viewing
Combined Synopsis/Solicitation
Posted: Dec 8, 2025
Nicolet iS50 Maintenance | GovScope