NIST Sitewide Handrail Project
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The National Institute of Standards and Technology (NIST) in Boulder, CO, is conducting market research via a Sources Sought notice to identify qualified Small Business construction firms for a Sitewide Handrail Project. This project involves the removal, modification, fabrication, and installation of permanent ADA-compliant handrail systems across multiple buildings on the NIST Boulder Campus. The goal is to bring existing stair and ramp handrail systems into full compliance with the 2010 ADA Standards for Accessible Design and applicable OSHA requirements. Capability statements are due by March 12, 2026, at 5:00 PM MDT.
Project Scope
The project encompasses comprehensive upgrades to handrail systems and related infrastructure. Key tasks include:
- Removal and Installation: Removal of existing lower guardrails and installation of new middle/center handrails and ADA-compliant handrails on stairs and ramps.
- ADA Compliance: All installations must strictly adhere to the 2010 ADA Standards for Accessible Design (Sections 505.3, 505.4, 505.5, 505.7, 505.8, and 505.10), ensuring appropriate diameter, continuous gripping surfaces, smooth finishes, and structural stability. Handrails must be installed between 34" and 38" vertically, with at least 12" extensions at top and bottom, and safely terminated.
- Concrete Work: Selective demolition and reconstruction of concrete stair and curb elements at specified locations, including Building 1 Wing 3 and 6 Dock.
- Material Specifications: Installation of sleeves, weather-strip treads, moisture protection, and matching existing exterior paint finishes.
- Locations: Work will be performed at various locations including Building 1 Wing 3 and 6 Dock Stairs and Handrails, Building 1 Wing 3 Ramp Handrails, Building 1 Annex D Handrails, Building 3 Front Entrance Handrails, and Building 22 East Entryway Staircase Handrails. Visual references are provided in an attachment.
Contract Details & Requirements
- Opportunity Type: Sources Sought (Market Research). This is not an RFP/RFQ.
- Anticipated Contract Type: Firm-Fixed-Price (FFP).
- Anticipated Period of Performance: Three (3) months from the date of award.
- NAICS Code: 236220 Commercial and Institutional Building Construction.
- Place of Performance: NIST Boulder Campus, Boulder, CO 80305.
- Set-Aside: Total Small Business Set-Aside. This opportunity is specifically for Small Business concerns (SB, SDB, WOSB, HUB Zone, VOSB, and SDVOSB). All vendors must be registered at www.sam.gov.
Submission & Evaluation
Interested small business contractors must submit a capability statement, not exceeding 10 pages, by March 12, 2026, at 5:00 PM MDT. Submissions should be emailed to lauren.lopez@nist.gov with the subject line: "Capability Statement for NIST Boulder ADA Handrail Project". The Government will use responses for planning purposes and may issue a competitive procurement later. No payment will be made for submitted information. A pre-proposal site visit is highly recommended.
Deliverables & Safety
Key deliverables due 10 days after project award include a Final Schedule, Site-Specific Safety Plan, Concrete Mix Design/Compaction Test, Exterior Paint Color and Spec, S.S. Hardware Submittal, Weather Strip Tread Submittal, and Sleeve Adapter Specs. Contractors must comply with NIST's Contractor Safety Program, provide a detailed site-specific Safety Plan, and adhere to HSPD-12 security requirements. Payment is 100% upon installation, acceptance, and successful completion.