NIST Sitewide Handrail Project

SOL #: 1333ND26RNB190009Solicitation

Overview

Buyer

Commerce
National Institute Of Standards And Technology
DEPT OF COMMERCE NIST
GAITHERSBURG, MD, 20899, United States

Place of Performance

Boulder, CO

NAICS

Commercial and Institutional Building Construction (236220)

PSC

Repair Or Alteration Of Restoration Of Real Property (Public Or Private) (Z2QA)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
Apr 2, 2026
2
Last Updated
May 4, 2026
3
Submission Deadline
May 11, 2026, 11:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The National Institute of Standards and Technology (NIST), U.S. Department of Commerce, is seeking a qualified contractor for the NIST Sitewide Handrail Project at its Boulder Campus in Colorado. This Total Small Business Set-Aside opportunity involves constructing, modifying, and installing ADA-compliant handrail systems to meet 2010 ADA Standards and OSHA requirements, while also improving snow removal functionality. Proposals are due May 11, 2026.

Scope of Work

The project requires the contractor to provide all labor, materials, equipment, and supervision for the installation of permanent ADA-compliant handrail systems. Key tasks include:

  • Verification of field conditions.
  • Demolition and replacement of select concrete stairs and curbs.
  • Fabrication and installation of handrails meeting specific dimensional, graspability, continuity, and safety standards.
  • Removal of existing lower railings and installation of compliant middle rails.
  • Installation of handrails on both sides of all stairs and ramps, with specific height and extension requirements.
  • Work across various buildings including Building 1 Wing 3 Ramp, Building 1 Annex D, Building 3 Front Entrance, Building 22 East Entryway, and Building 1 Wing 3 and 6 Dock Stairs.
  • Coordination with the Contracting Officer’s Representative (COR) for inspections and approvals.
  • Adherence to NIST security and access requirements, site-specific safety planning, and weekly progress coordination.

Contract & Timeline

  • Type: Solicitation / Request for Proposal (RFP)
  • Period of Performance: 90 days from the issuance of the Notice to Proceed.
  • Set-Aside: Total Small Business Set-Aside (NAICS 236220, Small Business Size Standard $45.0 Million).
  • Proposal Due: Monday, May 11, 2026, by 5:00 PM MT.
  • Questions Due: Monday, April 27, 2026.
  • Site Visit: Thursday, April 23, 2026, at 1:30 PM (highly recommended).
  • Published: May 04, 2026 (latest amendment).

Evaluation

Award will be based on a competitive evaluation of proposals. Factors considered are:

  • Factor 1: Technical Approach
  • Factor 2: Schedule
  • Factor 3: Price Factors 1 and 2 are approximately equal in importance and, combined, are more important than Factor 3.

Additional Notes

Offerors must reference the "Instructions to Offerors, Rev. 1" (superseding previous versions) and Provision 1352.270-71 for site visit details. Amendment 0002 incorporates Questions and Answers #1-30, the site visit sign-in sheet, and FAR Clause 52.222-90, "Addressing DEI Discrimination by Federal Contractors." A post-award construction meeting is required, and weekly progress meetings will be held on-site. The contractor's Site Specific Safety Plan must be accepted before a Notice to Proceed is issued.

People

Points of Contact

Lauren LopezPRIMARY
Travis ZoellnerSECONDARY

Files

Files

Download
Download
Download

Versions

Version 4Viewing
Solicitation
Posted: May 4, 2026
Version 3
Solicitation
Posted: May 1, 2026
View
Version 2
Solicitation
Posted: Apr 7, 2026
View
Version 1
Solicitation
Posted: Apr 2, 2026
View