NLDS Pad Sunshade
SOL #: FA930226Q0035Combined Synopsis/Solicitation
Overview
Buyer
DEPT OF DEFENSE
Dept Of The Air Force
FA9302 AFTC PZZ
EDWARDS AFB, CA, 93524-1185, United States
Place of Performance
Edwards, CA
NAICS
Prefabricated Metal Building and Component Manufacturing (332311)
PSC
Prefabricated And Portable Buildings (5410)
Set Aside
Total Small Business Set-Aside (FAR 19.5) (SBA)
Original Source
Timeline
1
Posted
Apr 16, 2026
2
Last Updated
Apr 21, 2026
3
Submission Deadline
Apr 30, 2026, 7:00 PM
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The U.S. Air Force is seeking quotes for an NLDS 90x90 Pad Conex Sunshade at Edwards AFB, CA. This is a 100% Total Small Business Set-Aside under Solicitation Number FA930226Q0035. Quotes are due by April 30, 2026, at 12:00 PM PST.
Scope of Work
This acquisition requires the design, fabrication, delivery, and installation of one (1) NLDS 90x90 Pad Conex Sunshade. Key specifications include:
- Dimensions: 34' Wide X 70' Long X 25' Center Height X 19' Side wall.
- Material: Tan, Flame-Retardant PVC Coated Laminated fabric (28 OZ. Cover).
- Frame: 24" Heavy Wall ASTM Zinc Tubular Steel with z-bar truss design on 10' centers.
- Inclusions: Trim Kit, Installation, Lightning Protection, and Shipping.
- Site: Installation on an existing 90'x90' concrete pad (6 inches thick) with 18" thick x 3' wide footings at Edwards AFB, CA.
- Structural Requirements: Engineering to withstand 110 mph sustained winds and compliance with Edwards AFB Design Standards for roof snow loads and seismic loads (ASCE 7-10 Seismic Design Category D).
- Contractor Responsibilities: Provide all labor, materials, tools, and equipment, including site preparation, safety barricades, clean-up, and demobilization. Adherence to various regulations (UFC, MIL STD, FAA, AFI, OSHA, environmental, security) is required.
Contract & Timeline
- Type: Combined Presolicitation/Solicitation, Request for Quote (RFQ).
- Set-Aside: 100% Total Small Business.
- NAICS: 332311 "Prefabricated Metal Building and Component Manufacturing" (Size Standard: 750 employees).
- Period of Performance: 12 weeks After Receipt of Order (ARO). The government is firm on this deadline.
- Quote Due Date: April 30, 2026, 12:00 PM Pacific Standard Time (PST).
- Questions Due Date: April 15, 2026, 12:00 PM PDT. All questions and answers will be posted as an amendment.
Evaluation & Submission
- Evaluation: Lowest Price Technically Acceptable (LPTA). Award will be made to the responsible offeror whose quote is responsive and considered LTPA, based on the lowest evaluated price of proposals meeting or exceeding acceptability standards for non-cost factors.
- Factors: Price and Technical Acceptability (ability to provide the NLDS 90x90 Pad Conex Sunshade, rated satisfactory/unsatisfactory).
- Submission: Complete quotes, including SF1449 and a separate PDF quote, must be emailed to carmen.barahona@us.af.mil AND jenna.jacobson@us.af.mil. Maximum file size is 10MB. Offerors must include SAM UEI, TIN, CAGE Code, Contractor Name, Payment Terms, POC Name/Phone, Email, Warranty, Offer Expiration Date, FOB Destination, and Estimated Delivery Lead Time.
- The government intends to award without discussions, so initial quotes should contain the best terms.
Points of Contact
- Primary: Carmen Barahona, Contract Specialist (carmen.barahona@us.af.mil)
- Secondary: Jenna Jacobson, Contract Officer (jenna.jacobson@us.af.mil)
People
Points of Contact
Jenna JacobsonPRIMARY
Carmen BarahonaSECONDARY
Files
Versions
Version 2Viewing
Combined Synopsis/Solicitation
Posted: Apr 21, 2026
Version 1
Combined Synopsis/Solicitation
Posted: Apr 16, 2026