NOAA/FCDAS Replacement of Two (2) Non-Operational Boilers

SOL #: 1332KP26Q0033Combined Synopsis/Solicitation

Overview

Buyer

Commerce
National Oceanic And Atmospheric Administration
DEPT OF COMMERCE NOAA
SILVER SPRING, MD, 20910, United States

Place of Performance

Fairbanks, AK

NAICS

Plumbing (238220)

PSC

Industrial Boilers (4410)

Set Aside

Total Small Business Set-Aside (FAR 19.5) (SBA)

Timeline

1
Posted
May 8, 2026
2
Submission Deadline
May 28, 2026, 7:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Quick Summary

The National Oceanic and Atmospheric Administration (NOAA) is soliciting proposals for the replacement of two (2) non-operational boilers at the Fairbanks Command Data Acquisition Station (FCDAS) in Fairbanks, AK. This acquisition is a 100% Total Small Business Set-Aside and will result in a Firm-Fixed-Price contract. Quotes are due May 28, 2026, at 3:00 PM EDT.

Scope of Work

The contractor will be responsible for providing all labor, materials, and equipment to:

  • Demolish and dispose of two existing, non-operational boilers in the Facilities Building and Powerhouse.
  • Procure and install two new commercial boilers (e.g., Burnham Model 905A or approved equal) with specified capacities.
  • Reconfigure one existing working boiler in the Facilities Building for easier service.
  • Install new boilers, including burners, valves, piping, electrical, and control wiring.
  • Integrate new boiler control systems with the existing Building Automation System (BAS) for lead/lag operation and balanced runtime.
  • Provide Operation and Maintenance (O&M) Manuals and training.

Work must be phased to ensure primary operational boilers remain functional 24/7/365, and expedited completion is encouraged to mitigate mission risk during the winter heating season. All pressure vessels must be manufactured and stamped according to the 2025 ASME BPVC.

Contract Details

  • Contract Type: Firm-Fixed-Price
  • Period of Performance: Twelve (12) months from the Date of Award (anticipated June 1, 2026, to May 31, 2027).
  • Place of Performance: FCDAS, Fairbanks, AK.
  • Set-Aside: 100% Total Small Business Set-Aside.
  • NAICS Code: 238220 (Plumbing, Heating, and Air-Conditioning Contractors).
  • Labor Standards: Subject to the Davis-Bacon Act; Wage Determination AK20260001 is applicable.

Submission & Evaluation

  • Submission: Quotes must be submitted electronically via email to Contract Specialist Bryton Curtis (bryton.curtis@noaa.gov) and Contracting Officer Mark Sullivan (mark.a.sullivan@noaa.gov).
  • Quote Structure: Quotes must be organized into four volumes: Technical Understanding, Past Performance, Management Plan, and Price.
  • Evaluation Factors: Award will be made to the responsible offeror representing the Best Value using a Trade-off process. Non-price factors (Technical Understanding, Past Performance, Management Plan) are approximately equal in importance and combined are significantly more important than price. Price reasonableness and realism will be evaluated, including verification of labor rates against the Davis-Bacon Wage Determination.
  • Offer Due Date: May 28, 2026, at 1500 Eastern Daylight Time.

Additional Notes

Offerors must be registered in the System for Award Management (SAM) at the time of quote submission. A detailed price breakout including Equipment, Installation Labor, Integration/Testing, and Mobilization/Travel is required. Costs for travel and mobilization must be included in the total firm-fixed-price for CLIN 0001.

People

Points of Contact

Bryton CurtisSECONDARY

Files

Files

Download
Download
Download
Download

Versions

Version 1Viewing
Combined Synopsis/Solicitation
Posted: May 8, 2026
NOAA/FCDAS Replacement of Two (2) Non-Operational Boilers | GovScope