Norfolk Harbor Southern Branch Maintenance Dredging

SOL #: W9123625BA005Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W2SD ENDIST NORFOLK
NORFOLK, VA, 23510-1096, United States

Place of Performance

Place of performance not available

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Maintenance Of Dredging Facilities (Z1KF)

Set Aside

No set aside specified

Timeline

1
Posted
May 7, 2025
2
Last Updated
Jun 13, 2025
3
Submission Deadline
Jun 11, 2025, 6:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Required work includes maintenance dredging, by mechanical dredging method, segments of the Southern Branch of the Elizabeth River, part of the Norfolk Harbor Federal Navigation Project. The segments are being dredged to required depth of -41 feet and -36 feet MLLW. One foot of allowable overdepth dredging will be part of the contract dredging pay prism.Dredged material generated by the project shall be transported by barge or scow and placed directed into the cell(s) at the Craney Island Dredged Material Management Area (CIDMMA). Dredging is estimated to generate approximately 96,200 cubic yards of available pay volume.The Contractor shall be responsible for the following: dredging within the designated areas to the required and allowable pay depths, transporting the dredged material to the CIDMMA, discharging the material by direct pump-out method into the designated Government- furnished placement site, properly operating and maintaining the spillways within the CIDMMA, ensuring effluent water leaving the CIDMMA meets State water quality requirements, and communicating with the Port of Hampton Roads maritime users to minimize impacts of vessel traffic, adjacent utilities, and other dredging operations.

People

Points of Contact

Files

Files

View
View
View
View

Versions

Version 3
Solicitation
Posted: Jun 13, 2025
View
Version 2Viewing
Solicitation
Posted: Jun 6, 2025
Version 1
Solicitation
Posted: May 7, 2025
View
Norfolk Harbor Southern Branch Maintenance Dredging | GovScope