NORTH BREAKWATER REPAIRS AT REDONDO BEACH-KING HARBOR

SOL #: W912PL25B0004Solicitation

Overview

Buyer

DEPT OF DEFENSE
Dept Of The Army
W075 ENDIST LOS ANGELES
LOS ANGELES, CA, 90017-3409, United States

Place of Performance

Place of performance not available

NAICS

Other Heavy and Civil Engineering Construction (237990)

PSC

Repair Or Alteration Of Other Conservation And Development Facilities (Z2KZ)

Set Aside

No set aside specified

Timeline

1
Posted
Feb 27, 2025
2
Last Updated
Aug 11, 2025
3
Submission Deadline
Jul 30, 2025, 8:00 PM

Qualification Details

Fit reasons
  • NAICS alignment with historical contract wins in similar service areas.
  • Scope strongly matches core technical capabilities and delivery model.
Risks
  • Past performance thresholds may require one additional teaming partner.
  • Potential clarification needed on staffing minimums before bid/no-bid.
Next steps

Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.

Update 0002 is to transmit the SF-30 (3 pages) for Amendment 0001 of the IFB W912PL25B0004. This is to update the Bid Guarantee details. Update 0001 is to provide site visit information. The project will consist of repairs to a shore-connected, rubble-mound breakwater that provides protection from ocean waves to King Harbor in Redondo Beach, Los Angeles County, California. Repair work will consist of resetting of existing armor stone as needed and furnishing and placement of approximately 8,000 tons of new armor stone having a median stone size of 14-tons. There is an armor stone bench on the harborside of the structure that also requires repairs, the bench is at elevation +10.0 feet MLLW and has a width of 8.0 feet. The work will restore the structures to the design elevations and slopes in observed damage areas. The estimated magnitude of this project is: Between $5,000,000 and $10,000,000. The total contract duration is estimated at 210 calendar days. This acquisition will be issued as an Unrestricted Sealed Bid awarded under FAR Part 14 Sealed Bidding. The solicitation to be issued on or about 17 March 2025 with a tentative bid opening date of 17 April 2025. Sub-contracting plans are required for all construction contracts awarded to a large business when the award amount exceeds $1,500,000. If the offeror is a large business, the firm will be required to submit a subcontracting plan as part of its bid package. Plans and specifications will not be provided in hard paper copy. When the Solicitation is issued, it will be available through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) suite at https://piee.eb.mil/For instructions on how to post an offer, please refer to the Posting Offer demo: https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf. Additional information is available via Web Based Training for the Solicitation Module at: https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/solicitation/proposals.xhtml The Government is not responsible for any loss of internet connectivity or for an offeror?s inability to access the documents posted at the referenced website. All offerors are advised that this project may be delayed, cancelled or revised at any time during the solicitation, selection, evaluation, negotiation and/or final award process. *PIEE Amendment 0001 is for administrative purposes only; this administrative Amendment is to increase the proposed solicitation issue date to on or about May 13, 2025, and response date to on or about June 17, 2025. Please be advised any official amendment issued will be accompanied by an SF-30. *PIEE Amendment 0002 is for administrative purposes only; this administrative Amendment is to increase the proposed solicitation issue date to on or about June 27, 2025, and response date to on or about July 29, 2025. Please be advised any official amendment issued will be accompanied by an SF-30.

People

Points of Contact

Files

Files

View
View
View
View

Versions

Version 13
Solicitation
Posted: Aug 11, 2025
View
Version 12
Solicitation
Posted: Aug 4, 2025
View
Version 11
Solicitation
Posted: Jul 28, 2025
View
Version 10
Solicitation
Posted: Jul 25, 2025
View
Version 9
Solicitation
Posted: Jul 25, 2025
View
Version 8
Solicitation
Posted: Jul 24, 2025
View
Version 7Viewing
Solicitation
Posted: Jul 16, 2025
Version 6
Solicitation
Posted: Jul 16, 2025
View
Version 5
Solicitation
Posted: Jun 30, 2025
View
Version 4
Pre-Solicitation
Posted: Jun 18, 2025
View
Version 3
Pre-Solicitation
Posted: Apr 17, 2025
View
Version 2
Pre-Solicitation
Posted: Apr 17, 2025
View
Version 1
Pre-Solicitation
Posted: Feb 27, 2025
View