Northern Hills Ranger District Parking Lot Reconstruction, Spearfish, South Dakota
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The USDA Forest Service is soliciting quotes for the Northern Hills Ranger District Parking Lot Reconstruction project in Spearfish, South Dakota. This project aims to address significant structural, grade, and drainage issues, improving public health, safety, and access. This is a Total Small Business Set-Aside with an estimated project magnitude between $1,000,000 and $5,000,000.
Scope of Work
The project involves comprehensive reconstruction of the parking lot. Key tasks include:
- Removing existing fencing, lighting, and surfacing.
- Providing new grade, surfacing, fencing, and lighting.
- Reconstructing the parking lot with proper base materials, regrading the site, and adding drainage.
- Constructing sidewalks and designated walking areas.
- Improving accessible parking and enhancing site lighting.
- Specific work items cover mobilization, earth moving, imported/excess material management, base and asphalt/concrete paving, site improvements, and demolition.
- Technical specifications detail requirements for earthwork, asphalt/concrete paving, joint sealants, pavement markings, chain link fences/gates, and exterior LED lighting, informed by a revised Geotechnical Report.
Contract Details
This will be a Firm Fixed Price contract. The anticipated Period of Performance is from June 15, 2026, through December 11, 2026. A Bid Bond/Offer Guarantee (SF24) of 20% of the total offer price (not to exceed $3 million) is required with the offer. 100% Performance and Payment Bonds (SF 25 and SF 25A) are required within 10 calendar days after award. Offerors must hold prices for 60 calendar days.
Evaluation Criteria
Quotes will be evaluated using a comparative methodology to determine the best value to the Government, considering:
- Technical Approach: A detailed 2-4 page explanation, including a construction schedule (Gantt chart).
- Past Performance: Description of similar contract experience within the last 5 years, with a reference list.
- Price: Submitted on "Attachment 2 - Schedule of Items" Excel spreadsheet, rounded to the nearest whole dollar, evaluated for fairness and reasonableness.
Key Dates & Contacts
- Quotes Due: June 4, 2026.
- Submission Method: Email to Contract Specialist Holly Hlavac (Holly.Hlavac@usda.gov) and Contracting Officer Lucas Dahlman (Lucas.Dahlman@usda.gov).
- Primary Contact: Holly Hlavac (holly.hlavac@usda.gov).
Amendments & Notes
- Amendment A0003 (May 18, 2026) incorporated consolidated Q&A, the site visit sign-in sheet, a revised Geotechnical Report (M2215045), and updated DWG files, clarifying various project aspects.
- Amendment A0002 (May 14, 2026) extended the quote deadline to June 4, 2026, and the period of performance start date to June 15, 2026.
- Amendment A0001 (April 22, 2026) incorporated FAR Clause 52.222-90, "Addressing DEI Discrimination by Federal Contractors."
- A site visit was conducted on May 6, 2026.
- Offerors must acknowledge all amendments.