Notice of Contract Award - Valve Overhaul
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Quick Summary
The Department of the Navy, specifically NAVSUP Fleet Logistics Center Norfolk, has awarded a contract for Valve Overhaul services for the USS GUNSTON HALL (LSD-44). The award, valued at $52,170.00, was made to Moody Marine Service LLC on May 14, 2026, under urgent and compelling conditions. This action was necessary to ensure the ship's operational readiness and prevent serious injury or financial harm to the Government.
Scope of Work
The awarded services include the overhaul of critical components on the USS GUNSTON HALL (LSD-44) during its continuous maintenance availability (CMAV). Key tasks involve:
- Overhaul of high and low-pressure air reducers in AMR1 and AMR2.
- Overhaul of lube oil cooler valves for the main engines in MMR1 and MMR2.
- Setting the fuel oil back pressure for the NR2 Ship Service Diesel Generator (SSDG).
- Addressing issues with high pressure air start valves. These services are vital for the NR2 SSDG, and the ship's force lacks the capability to perform them.
Contract & Timeline
- Contract Number: N0018926PL131
- Awarded To: Moody Marine Service LLC (Cage Code: 11DX1)
- Award Value: $52,170.00
- Award Date: May 14, 2026
- Period of Performance: May 29, 2026, to June 01, 2026
- Place of Performance: Norfolk, VA
- Set-Aside: Sole Source (due to urgent and compelling circumstances)
Justification for Award
This contract was awarded on a sole source basis due to urgent and compelling circumstances, precluding full competition in accordance with FAR 12.102(a). The justification highlights the critical need for repairs by May 29, 2026, to allow the USS Gunston Hall to exit its CMAV and meet operational readiness requirements, including Light Off Assessment (LOA) and MOB-E. A delay would result in the ship lacking redundancy for its primary generators, posing a significant safety risk and preventing it from meeting minimum equipment requirements.
Additional Notes
This is a notice of contract award and not a request for quotation or proposal. No solicitation documentation is available, and no contract will be awarded based on responses to this notice. For further questions, contact Contract Specialist Joseph Frech at joseph.l.frech.civ@us.navy.mil.