Notice of Intent to Sole Source (FFS Bridge)
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
This special notice is pursuant to FAR 6.302-1, as the incumbent contractor is currently the only responsible source capable of providing uninterrupted full food service support without unacceptable delays or mission impact. The bridge contract will allow sufficient time to complete the competitive reprocurement process for a follow-on long-term solution.
The IDIQ is used to support full food service (FFS) requirements for designated Dining Facilities at Fort Bragg, North Carolina. The Contractor shall provide quality services in support of the installation food service program that supports the Warfighter with flexible, efficient and cost-effective service. The service outlined in this requirement encompasses Dining Facility Management functions, to include food receiving and storage, food preparation, food serving, remote site feeding, and facility sanitation duties. Performance criteria for overall duties fall under Contractor responsibilities.