NOZZLE, AUGMENTER EX
Overview
Buyer
Place of Performance
NAICS
PSC
Set Aside
Original Source
Timeline
Qualification Details
Fit reasons
- NAICS alignment with historical contract wins in similar service areas.
- Scope strongly matches core technical capabilities and delivery model.
Risks
- Past performance thresholds may require one additional teaming partner.
- Potential clarification needed on staffing minimums before bid/no-bid.
Next steps
Validate eligibility requirements, assign capture owner, and schedule partner outreach to confirm teaming strategy before submission planning.
Memo To File
Date: 24 March 2025
PR# FD2030-24-01354
Re: Synopsis Exception
The proposed contract action will not be synopsized IAW with FAR 5.202(a)(13)
for the following reasons: “(i) Is for an amount not expected to exceed the
simplified acquisition threshold; (ii) The solicitation will be made through a means
that provides access to the notice of proposed contract action through the GPE;
and (iii) Public is able to respond to the solicitation electronically through the GPE
and offerors are permitted to respond electronically.
JAMES HEADINGTON
Contracting Officer
HEADINGTON.J
AMES.E.114124
2276
Digitally signed by
HEADINGTON.JAMES.E.1
141242276
Date: 2025.03.24
06:54:52 -05'00'